BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated July 3, 2025

Site work and paving for a mixed-use development in Old Orchard Beach, Maine. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 11, 2025, no bids received. As of this time it is unknown if and when project will rebid.** Harmon/Murphy/Michaud Avenues Sewer and Drainage Improvements Drainage improvements to Harmon avenue, Michaud avenue, and murphy avenue and sewer improvements to Michaud avenue. Drainage improvements include roadway reconstruction, new sidewalk pavement and detectable warning plates, new catch basins, approximately 2,080 linear feet of new storm drain, and utility relocations to accommodate new storm drain system. Roadway reconstruction will include new subbase and base gravels, roadway and intersection grading, new Gravel shoulders, and new pavement. Sewer improvements on Michaud AVE include the replacement of approximately 240 linear feet of asbestos cement pipe with 8” PVC and replacement of two sewer manholes. The Issuing Office is Wright-Pierce. Information and Bidding Documents for the Project can be found at the following designated website: https://www.wright-pierce.com/projects Bidding Documents may be downloaded from the designated website at a cost of $65 per download. A pre-bid conference for the Project will be held on February 11, 2025 at 10:00 am at the project site located at the corner of Harmon Avenue and Michaud Avenue. Attendance at the pre-bid conference is encouraged but not required.

Final Planning

Water / Sewer

$2,000,000.00

Public - City

Paving, Site Work

30

13

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
98
Bidding Soon
1,584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

September 11, 2025

Project location map

Multiple Locations, Old Orchard Beach, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.