Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated July 3, 2025
Site work and paving for a mixed-use development in Peru, Maine. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The project includes removal and replacement of precast concrete ramp planks, paving a section of the parking area, and other site improvements at Worthley Pond in Peru, Maine. The contract shall designate the Substantial Completion Date on or before September 30, 2025 , and the Contract Final Completion Date on or before October 17, 2025. Question Deadline 03/27/2025 at 5:00 PM ET Questions and comments on the bid opening process shall be addressed to: Division of Planning, Design & Construction, Bureau of General Services, 77 State House Station, Augusta, Maine 04333- 0077, BGS.Architect@Maine.gov. Questions and comments regarding the project design specifications or drawings shall be directed in writing to the Consultant during the bid period prior to the question Pine Tree Engineering, Inc. Robert L. Prue, P.E. rprue@pte-maine.com. Bid security is required on this project. The Bidder shall include a satisfactory Bid Bond (section 00 43 13) or a certified or cashier's check for 5% of the bid amount with the completed bid form submitted to the Owner. The Bid Bond form is available on the BGS website. Performance and Payment Bonds are required on this project. If noted above as required, or if any combination of Base Bid and Alternate Bids amounts selected in the award of the contract exceeds $125,000.00, the selected Contractor shall furnish a 100% contract Performance Bond (section 00 61 13.13) and a 100% contract Payment Bond (section 00 61 13.16) in the contract amount to cover the execution of the Work. Bond forms are available on the BGS website An on-site pre-bid conference will not be conducted for this project The Owner reserves the right to accept or reject any or all bids as may best serve the interest of the Owner or Bid security is not required on this project.
Post-Bid
Sidewalks / Parking Lot
$500,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
May 16, 2025
To Be Determined, Peru, ME
Related To This Project
Peru, ME
--
Peru, ME
--
Scarborough, ME
--
Sorrento, ME
Bid Date: Mar 28 2025
Millinocket, ME
Bid Date: Apr 02 2025
Scarborough, ME
--
South Portland, ME
--
Lincoln, ME
Bid Date: Mar 26 2025
Bangor, ME
Bid Date: Mar 31 2025
Augusta, ME
Bid Date: Mar 13 2025
Pownal, ME
Bid Date: Mar 25 2025
Sweden, ME
Bid Date: Apr 02 2025
Anson, ME
Bid Date: Apr 02 2025
Madison, ME
Bid Date: Apr 02 2025
Norway, ME
Bid Date: Apr 01 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
