Published August 26, 2024 at 8:00 PM
Updated July 3, 2025
Site work and paving for a civil project in Phippsburg, Maine. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.
Work under this contract includes all work required to complete the Transfer Station Improvements - Phase 1 project in Phippsburg, Maine, as shown on the plans. In general, the work involves areas of paved full depth reconstruction, and areas of removing pavement, regrading, and paving. In addition, the project includes common excavation, grading, installation of concrete waste block retaining walls, and drainage system improvements. Questions regarding this project may be directed to the Project Manager: Jeremy R. Prue, P.E. (207) 443-1508 jrprue@pte-maine.com Location #1 shall be constructed first in order to facilitate temporary storage of metals, tires, refrigerant appliances so that the Town can maintain normal Transfer Station operations throughout the duration of the construction. Active construction is only allowed on days when the Transfer Station is closed to the public. The Transfer Station is open to the public on Mondays, Wednesdays, and Saturdays. The undersigned agrees, if this bid is accepted, to complete the work between September 3, 2024 and November 1, 2024. The Owner reserves the right to reject any and all bids, to waive any technical or legal deficiencies, and to accept any bid which is deemed to be in the best interest of the Owner. The proposed work shall include the following items: 1. Common excavation, backfilling, compacting, and grading. 2. Installing drainage system including 18'' HDPE culvert, and stone-lined ditching. 3. Installation of compacted gravel base and subbase per the plans. 4. Installation of hot mix asphalt surface and base pavement per the plans. 5. Installation of concrete waste block retaining walls (2' x 2' x 6' x 2 rows high). 6. The Contractor is responsible for dust control, and soil erosion and sedimentation control throughout the duration of the project.
Award
Roads / Highways
$141,250.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2024
September 3, 2024
Multiple Locations, Phippsburg, ME
Related To This Project
Phippsburg, ME
--
Phippsburg, ME
Bid Date: Nov 04 2024
Phippsburg, ME
Bid Date: Feb 04 2025
Phippsburg, ME
Bid Date: Apr 22 2025
Phippsburg, ME
Bid Date: Jul 10 2025
Phippsburg, ME
Bid Date: Jul 15 2025
Phippsburg, ME
Bid Date: May 25 2023
Phippsburg, ME
Bid Date: Apr 04 2023
Phippsburg, ME
Bid Date: Sep 12 2022
Phippsburg, ME
Bid Date: May 11 2022
Portland, ME
--
Portland, ME
--
Portland, ME
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.