Published August 26, 2024 at 8:00 PM

Updated July 3, 2025

Site work and paving for a civil project in Phippsburg, Maine. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

Work under this contract includes all work required to complete the Transfer Station Improvements - Phase 1 project in Phippsburg, Maine, as shown on the plans. In general, the work involves areas of paved full depth reconstruction, and areas of removing pavement, regrading, and paving. In addition, the project includes common excavation, grading, installation of concrete waste block retaining walls, and drainage system improvements. Questions regarding this project may be directed to the Project Manager: Jeremy R. Prue, P.E. (207) 443-1508 jrprue@pte-maine.com Location #1 shall be constructed first in order to facilitate temporary storage of metals, tires, refrigerant appliances so that the Town can maintain normal Transfer Station operations throughout the duration of the construction. Active construction is only allowed on days when the Transfer Station is closed to the public. The Transfer Station is open to the public on Mondays, Wednesdays, and Saturdays. The undersigned agrees, if this bid is accepted, to complete the work between September 3, 2024 and November 1, 2024. The Owner reserves the right to reject any and all bids, to waive any technical or legal deficiencies, and to accept any bid which is deemed to be in the best interest of the Owner. The proposed work shall include the following items: 1. Common excavation, backfilling, compacting, and grading. 2. Installing drainage system including 18'' HDPE culvert, and stone-lined ditching. 3. Installation of compacted gravel base and subbase per the plans. 4. Installation of hot mix asphalt surface and base pavement per the plans. 5. Installation of concrete waste block retaining walls (2' x 2' x 6' x 2 rows high). 6. The Contractor is responsible for dust control, and soil erosion and sedimentation control throughout the duration of the project.

Award

Roads / Highways

$141,250.00

Public - City

Paving, Site Work

6

3

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
36
Bidding Soon
772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 3, 2024

Project location map

Multiple Locations, Phippsburg, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.