BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work, paving and renovation of a mixed-use development in Portland, Maine. Completed plans call for site work for a bridge / tunnel; bridge / tunnel; and sidewalk / parking lot.

The work consists of South Street Underpass bridge repairs, Mile 32.8, in the Town of Biddeford; Saco Toll Plaza slab repairs, Mile 35.7, in the Town of Saco; Northern Hart Brook culvert repairs, Mile 79.9, in the town of Lewiston; and Falmouth Road Underpass bridge repairs, Mile FS1.7, in the Town of Falmouth. The work includes bridge deck milling and paving, bridge joint rehabilitation, toll plaza slab sensor loop replacement, concrete culvert repairs, bridge girder concrete haunch removal, concrete protective coating, temporary access road construction, maintenance of traffic and all other work incidental thereto in accordance with the Plans and Specifications. All work shall be governed by the Specifications entitled "State of Maine, Department of Transportation, Standard Specifications, Revision of November 2014", "Standard Details, Revision of November 2014" and "Best Management Practices for Erosion and Sediment Control", latest issue. Proposals must be made upon the Proposal Forms furnished by the Authority separately with the Contract Documents, and must be enclosed in the sealed special addressed envelope provided therefore bearing the name and address of the Bidder, the name of the Contract, and the date and time of Proposal opening on the outside. The Authority reserves the unqualified right to reject any or all Proposals and to accept that Proposal which in its sole judgment will under all circumstances serve its best interest. For general information regarding Bidding and Contracting procedures, contact Nate Carll, Purchasing Manager, at (207) 482-8115. Pre-qualification requirements: Bids will be accepted from Contractors prequalified by the Maine Department of Transportation for Bridge Construction Projects. All other bids may be rejected. Proposals must be accompanied by an original bid bond, certified or cashier's check payable to the Maine Turnpike Authority in an amount not less than Five (5%) Percent of the Total Amount in the Proposal, but not less than $500.00. The Bidder to whom a Contract is awarded will be required to furnish a Surety Corporation Bond, satisfactory to the Authority, on the standard Contract Bond form of the Authority, for a sum not less than the Total Amount of the Proposal. Question Deadline 02/10/2026: To submit specific questions, use the electronic Request for Information (RFI) tab. Responses will not be prepared for questions received by telephone.

Award

Bridges / Tunnels

$1,970,955.00

Public - State/Provincial

Paving, Renovation, Site Work

27

11

7

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
0
Bidding Soon
589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

April 20, 2026

Project location map

Multiple Locations, Portland, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.