BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Renovation of a mixed-use development in Waterville, Maine. Completed plans call for the renovation of a swimming pool; and power facility.

The City of Waterville is seeking proposals from Solar Installation contractors for the installation of 12kw of photovoltaic solar panels at the Waterville Municipal Pool. The energy system will be installed on the facility's southeast and southwest-facing roof segments of the pool house building. The system will offset roughly 40% of the pool house's energy needs, decreasing utility expenses and contributing to Waterville's climate resilience by reducing its carbon footprint. Waterville's municipal pool is used by thousands of people each summer, and this energy system will serve as a demonstration project, encouraging adoption of renewable energy throughout the community. The Contractor's proposed work description should be included with this bid. A bid bond, performance, and payment bonds will not be required The successful Contractor will perform the following scope of work: 1. Site Preparation: Review the municipal pool house roof structure to ensure it is structurally prepared for installation of the energy system. Analyze energy system design as needed. 2. Panel and Inverter Installation: Procure 12kw of PV solar panels, inverters and mounting systems for the pool house. Install the procured materials onto the pool house roof. 3. Electrical Integration for Net Metering: Connect the 12kw solar energy system into the City's electrical grid infrastructure and establish a net metering system using best practices. 4. Post-Installation Testing: Conduct site visits to ensure system is producing energy, net metering is functional and integration to electrical grid continues to be successful. The Owner will be responsible for providing access to the areas of construction and a secure storage area for materials and tools to be used. The contractor will be allowed to use on-site electrical, water, and bathroom facilities. 2. October 8, 2025: City Q&A period closes. All questions submitted to amcpherson@waterville-me.gov. The project installation shall have a minimum of a 1-year warranty, which shall commence on the date of final acceptance from the City. Other warrantees will be provided for the installed equipment and components per the manufacturer.

Award

Solar Power Generation

$35,400.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
43
Bidding Soon
483
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 21, 2025

Project location map

132 North St, Waterville, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.