BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2025 at 8:00 PM

Updated March 13, 2025

Renovation of a stadium in State College, Pennsylvania. Completed plans call for the renovation of a stadium.

As of March 12, 2025, this project commenced construction in late December 2025. The previous solicitation is listed below for reference: The primary scope of the Beaver Stadium renovation is on the stadium's West Side. This approach would replace the current West Side of the stadium and provide improved access for broadcasting, greatly improved circulation, new restrooms, upgraded concession offerings, and much-needed premium seating. Included with the West Side replacement are much-needed miscellaneous improvements of the North, East, and South, as listed below. These combined projects will greatly enhance the fan experience and safety and provide significant incremental revenue to fund these improvements. Package Number Package Name 00-02 ECI - Structural Steel 00-03 ECI - Electrical 00-04 ECI - Low Voltage 00-06 ECI - Plumbing 00-07 ECI - Mechanical 00-08 Structural Precast ECI 00-09 Deep Foundations ECI 00-10 Structural Precast ECI 02-Jul West Concrete 02-Aug West Sitework & Utilities 01-Mar 2024 East Stadium Improvements - Deep Foundations 01-Apr 2024 East Stadium Improvements - Site & Excavation 01-May 2024 East Stadium Improvements - Steel 01-Jun 2024 East Stadium Improvements - CIP Concrete 01-Jul 2024 East Stadium Improvements - Plumbing 01-Aug 2024 East Stadium Improvements - Electrical 01-Sep 2024 East Stadium Improvements - Metal Panels 01-Oct 2024 East Stadium Improvements - Masonry 01-Nov 2024 East Stadium Improvements - General Trades 01-Dec 2024 East Stadium Improvements - Roll-Up Gates Jan-13 2024 East Stadium Improvements - Canopy Jan-14 2024 East Stadium Improvements - Paint & Coatings Jan-15 2024 East Stadium Improvements - Fire Protection 00-01 Early Contractor Involvement (ECI) Preconstruction - Selective Structural Demolition 00-01 Interior Demolition 04-Jan East Suites Interior Demolition 04-Feb East Suites General Trades 04-Mar East Suites Metal Studs, Drywall and Ceilings 04-Apr East Suites Flooring 04-May East Suites Paint 04-Jun East Suites Fire Protection 02-Jan West Metal Panels 02-Feb West Curtain Wall 02-Mar West Roofing 02-Apr West Fire Protection 02-May West Fireproofing & Spray Insulations

Under Construction

Arenas / Stadiums

$10,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
107
Bidding Soon
814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

February 17, 2025

Project location map

1 Beaver Stadium, State College, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.