Renovation of a mixed-use development in Roma, Texas. Completed plans call for the renovation of a military facility; and power facility.

BID due date has been extended until 4/2/2025 3pm MST. The International Boundary and Water Commission is seeking a price quote for a Bathroom Remodel at the IBWC Falcon Field Office, PO Box, 1 FM 2098 Reservoir Rd., Falcon Heights, TX 78545. The government will award to the lowest price, technically acceptable, responsible offeror. Quote due date via GSA by 3:00pm MST on March 31, 2025. Quote shall be good for 90 days. Items shall be quoted all or none as per CLIN structure and PWS attached. CLIN Structure Attachment SHALL be return with your quote. Offeror shall provide detailed plans for work quoted. Offeror shall complete work within 180 days after award or earlier to USIBWC, Falcon Field Office, PO Box, 1 FM 2098 Reservoir Rd., Falcon Heights, TX 78545. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred as a result of this request for proposal. This requirement is Full and Open Competition, the applicable NAICS code is 236118 Residential Remodelers, with a Product Service Code Y1FZ with a size standard of 45 Million. IBWC COR: Edi Delgado Any solicitation questions shall be directed to my attention ONLY at adrian.knights@ibwc.gov A site visit is highly encouraged - pictures are allowed but no pictures of other attendees or IBWC personnel are allowed. If interested contact Edi Delgado at edi.delgado@ibwc.gov, Site visit can be scheduled between March 18-20, 202 5 AND March 25-28, 2025. Only contact Edi Delgado for site visit scheduling inquiries. The site visit is not a Question-and-Answer session. It is meant to allow for information to be collected on the site and the conditions. Any questions must be submitted in written form. Questions in writing are due by e-mail directly to my attention at adrian.knights@ibwc.gov by March 24, 2024. Please include FY255701021 Bathroom Remodel in the subject line of all communication/emails. No Phone calls will be accepted. Payment information: The Contractor will be paid in accordance with FAR 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (July 2013 to Oct 2018). Invoices will be submitted electronically via Invoice Processing Platform (IPP). Invoice Processing Platform The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury's Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency. Information concerning accessing the IPP system will be provided at time of award. 52.212-4 Contract Terms and Conditions - Commercial Products and Commercial Services (Nov 2023) Active UEI (Unique Entity Identifier) must be included with your offer. As per FAR 15.207(c) and SBU information in the solicitation: If you need a copy of the plumbing plans, please fill out the form in the attachments with your vendor information. If you do not have any subcontractors, you may leave that section blank. Upon receiving your completed request form, the plans will be forwarded to you. Should you have any questions or require further assistance, please do not hesitate to contact me at adrian.knights@ibwc.gov. End of RFQ. POC: Adrian Knights, adrian.knights@bwc.gov The Contractor shall Provide/ Design/Remove/Install/Remodel Four(4) Bathrooms in Falcon Power Plant. Also, the Contractor shall provide all the material, supplies, transportation, tools, supervision necessary to perform the work as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform the project to the standards specified in this contract If during review of these items, the Contractor finds discrepancies, omissions, conflicts, defects, errors, or ambiguities, they have a duty to inquire and shall notify the Contracting Officer prior to the question submission deadline as established in the solicitation. The Contractor shall also inquire about items that are unclear or open to interpretation. The Contractor shall prepare a project schedule which shall reflect completion of all work under this Performance Work Statement. 2.2 Project schedule submittal shall include an electronic pdf file. 1. All abbreviations shall be defined. 2. Each project schedule shall show a revision date.

GC Bidding

Military

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.