Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 21, 2025 at 8:00 PM
Updated July 22, 2025
Renovation of a military facility in Sumter, South Carolina. Completed plans call for the renovation of a military facility.
roject Title: B1118 SAPR Office Wall & Door Project Location: Shaw AFB Period of Performance: Not to Exceed 30 days after issuance of Notice to Proceed. Competition: This is a Competitive Small Business set aside acquisition for NAICS 236220. Magnitude of Construction is less than $25,000.00 Site Visit is scheduled for 2 June 2025 at 9:30 AM on Shaw AFB. For Base Access requests contact the Contracting Officer, Ms. Zelda Williams at moore.williams.1@us.af.mil or the Contract Specialist, Kishauna Goodman at kishauna.goodman@us.af.mil NLT Thursday 30 May 2025 at 2:00 PM EST. Base access will not be permitted without prior coordination. Question Deadline 06/24/2025 Questions or request for Clarifications shall be submitted in writing to the Contracting Officer Contracting Officer, Zelda Williams at moore.williams.1@us.af.mil Install new interior wall in SAPR office to create (2) separate office rooms. Ensure the cove base and paint matches current setup. Install new glass door to hallway. BASE BID (CLIN 0001): o Demo ceiling tiles and remove ceiling grid where new wall will be built. o Demo carpet at wall location in middle of room. o Install new fire alarm components in new room that match existing alarm. o Connect wiring for fire alarm to necessary power supply. o Program fire alarm system. o Construct new 3-5/8" metal studs, 5/8" sound board drywall on each side, and acoustical insulation between studs. o Paint 1 primer layer and 2 coats of paint to match existing color. o Install ceiling grid and ceiling tile matching the existing system and tile. o Install cove base to new wall to match existing. o Install glass door to match existing, hardware, with cypher lock. o Install new light switch & separate lighting so lights work independently. GENERAL DESIGN AND CONSTRUCTION NOTES: Any references to State Government, Federal Government, or Industry standards or specifications made herein shall form a part of this specification to the extent referenced thereto and all materials and workmanship under this contract shall comply with or exceed these standards and references. All referenced standards shall be the latest edition. All manufactured equipment and products shall be new materials in good condition and installed as per manufacturer's latest printed instructions, unless specified otherwise herein. The Contractor is responsible for protection of existing facilities equipment from damage during installation and testing operations Time Zone: All times are Eastern Standard Time (EST) POC: Contract Specialist, Kishauna Goodman at kishauna.goodman@us.af.mil Contracting Officer, Zelda Williams at moore.williams.1@us.af.mil All correspondence shall be emailed to the Contract Specialist and Contracting Officer Proposals are due by 26 Jun 2025 at 2:00 P.M. and must be addressed to: 20 CONS/PKB CO/CS NAME" The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses and permits necessary to complete the requirements within. All work shall be done in strict accordance with the attached Statement of Work and subject to the terms and conditions of the contract and in accordance with (UFC) Unified Facilities Criteria, Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), International plumbing code (IPC), South Carolina Department of Health and Environmental Control (SCDHEC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), South Carolina Department of Health and Environmental Control (SCDHEC) Shaw Air Force Base Design and Construction Standards, Change 2, 21 Aug 2018 and all other applicable codes.
Post-Bid
Military
$25,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
August 1, 2025
To Be Determined, Sumter, SC
Related To This Project
Sumter, SC
Bid Date: Jun 24 2025
Sumter, SC
Bid Date: Apr 08 2025
Sumter, SC
Bid Date: May 06 2025
Sumter, SC
Bid Date: May 08 2025
Sumter, SC
Bid Date: May 20 2025
Sumter, SC
--
Sumter, SC
Bid Date: May 20 2025
Sumter, SC
Bid Date: Apr 30 2025
Sumter, SC
--
Sumter, SC
Bid Date: Apr 09 2025
Sumter, SC
Bid Date: Apr 09 2025
Sumter, SC
Bid Date: Mar 27 2025
Sumter, SC
Bid Date: Apr 10 2025
Sumter, SC
Bid Date: May 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
