BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2022 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a library in Middletown, Maryland. Completed plans call for the construction of a 15,250-square-foot library.

Addendum #1-#6 have been issued as of 5-17-2022. Note from Waynesboro Construction: Project Description: Per The Addendum # 1 Bid Form, The Wage Scale Difference Of The Labor Within Your Quote Needs To Be Broke Out. The Job Will Be Wage Scale, But They Need This Info Provided With The Bid For Informational Purposes. Also, See The Addendum # 1 Alternate & Unit Prices Requested On The Bid Form. Please Provide As They Apply To Your Scope. The Work of this Project is defined by the Contract Documents and includes but is not limited to the following: The construction of a new 15,426 square foot public library facility. The building Use Group is classified as A-3 (Assembly). The Construction Classification Type is IIB. The facility will include concrete foundations with partial basement, partial slab-on-grade and partial depressed slab-on-grade below raised access flooring system. Exterior finishes include manufactured stone veneer, cementitious siding, metal-clad panel system and aluminum curtain wall and storefront glazing systems, as well as standing-seam metal and TPO roofing systems. The facility will include a raised access flooring system and interior partitions will be metal stud with gypsum wall board with selected interior finishes. Ceilings will include painted drywall and lay-in acoustical ceiling systems. Work will also include a complete HVAC system (including partial under-floor system), electrical service, lighting, plumbing and plumbing fixtures. Site work will include grading, utilities (including water, sanitary, storm water, and electrical), parking lot paving and striping, site lighting, landscaping and dumpster enclosure. Site work shall be unclassified and no blasting is to be utilized on site. A fully functioning, temporary construction trailer shall be installed prior to the start of construction.

Award

Library

$8,630,000.00

Public - County

New Construction, Site Work

198

69

71

3

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
196
Bidding Soon
3,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

July 1, 2022

Project location map

31 E Green St, Middletown, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.