BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Long Beach, California. Design plans call for site work for a transportation facility.

As of November 16, 2021, this project is in the design phase and design is being done by owner in-house staff. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: 1. Review one-week of security camera footage of rail operations from the Port's Security Division and Port Interim Administration Office, focusing on existing rail traffic for relevant rail segments. Collect cargo volume data from individual terminals. This is to identify operation issues, rail volumes and delays during the peak hours determined by the terminal operators. Meet with Pacific Harbor Line to review findings and confirm understanding of current operations. Prepare a technical memorandum on existing operations. 2. Review the Pier B Yard On-Dock Rail Support Facility Rail Simulation Modeling and Analysis Report prepared by HDR and TranSystems. Extract useful data if needed to build a simulation model for railroad operations from 9th Street Crossing and south, in order to compare the existing operations and future (Year 2025) operations with and without the fourth track connection improvement. The future volume should be based on the 2016 San Pedro Bay Cargo Forecast by Mercator for Master Planning. 3. Develop a dynamic simulation model of POLB rail network south of the 9th Street at-grade crossing. The model results shall demonstrate both visually and analytically the contrast in rail operations with and without the fourth track connection improvement. A total of four model runs shall be included in the simulation analysis: Two scenarios of with and without the fourth track using existing 2017 rail traffic volumes; and two future scenarios of with and without the fourth track using projected rail traffic volumes for Year 2025. 4. Develop, outline, and compare up to three viable alternatives for the fourth track addition, including the two alternatives described under PURPOSE AND OBJECTIVES, which involve modifying the existing overcrossing off-ramp structures and shifting Harbor Scenic Drive westerly to accommodate the fourth track connection. 5. Illustrate any modifications to the existing roadways and structures for each of the alternatives, preferably with graphic exhibits or drawings. Develop design and construction schedules and cost estimates for each alternative. 6. Provide a discussion of the alternatives with pro-and-con analysis of the alternatives and recommendation of a preferred alternative supported by cost-benefit data. 7. Provide the preliminary roadway and rail layout plan, profile and sections for the preferred alternative. Identify design elements that are not in conformance with POLB Design Standards for the preferred alternative. Layout plan should include POLB provided utility and ROW, known environmental and geotechnical impacts and risks. 8. Review rail and vehicle traffic impacts and provide conceptual phasing plan for the preferred alternative. Outline traffic detour requirements if needed during construction. 9. Document the project approach, findings, and recommendations. Online Q&A: Yes Q&A Deadline: May 12, 2017 8:00 AM The method of contractor selection is not determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Transportation Terminals

$1,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
135
Bidding Soon
2,373
All Active Projects
1,085
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

img_map_placeholder

E Ocean Blvd, Long Beach, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.