Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a bridge / tunnel in Flemington, Pennsylvania. Design plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
https://www.penndot.pa.gov/regionaloffices/district-2/pages/details.aspxnewsid=2624 PennDOT Gives Update on Clinton County Bridge Preservation Work 05/05/2023 Clearfield, PA - The Pennsylvania Department of Transportation (PennDOT) announced that the contractor for a bridge preservation project involving three Clinton County structures plans to start work at a second location on Monday, May 8. This work will improve the sufficiency rating of all three bridges to "good." The contractor will start work on a Route 150 bridge spanning Bald Eagle Creek near Flemington Monday, May 8. Crews will place temporary traffic signals and set them to "flash" mode. The contractor will activate them after five days, and they will start to enforce an alternating traffic pattern across the bridge through the open lane. The contractor will implement a detour at this location throughout June. PennDOT plans to issue an update with details on the detour route before the contractor implements it. Work on a Route 150 bridge spanning Chatham Run in Dunnstable Township, Clinton County, started April 3 and continues. Work on that bridge revolves around the substructure, and PennDOT expects traffic impacts to be minimal. However, PennDOT advises drivers to anticipate periods when the contractor reduces traffic to a single lane and to build extra time into their travel schedules to compensate. The contractor expects work on this bridge to be ongoing until the end of June. Work on the third bridge to see work under this contract, a Route 220 bridge spanning Route 2006 and Fishing Creek, wrapped last construction season. The contractor does intend to return to this bridge later in the construction season to complete an epoxy overlay. PennDOT will issue an update before that work begins. PennDOT reminds drivers to use caution in work zones, obey posted speed limits, and always buckle up. HRI, Inc. of State College, PA, is the contractor for this $3.5 million job. Motorists are encouraged to "Know Before They Go" by checking conditions on more than 40,000 roadway miles by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information, and access to more than 1,000 traffic cameras. ___________________________________________________________________________________________________ Clinton County Beech Creek Township SR 150 over UNT to Bald Eagle Creek BMS# 18015000500000 As of November 12, 2019, the project is in development stage. Anticipated letting date is February 13, 2020. PennDOT - SR 150 over Bitner Run *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Bridges / Tunnels
$1,647,876.00
Public - State/Provincial
Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2023
PA-150, Flemington, PA
Related To This Project
Flemington, PA
Bid Date: Feb 21 2024
Flemington, PA
Bid Date: Feb 21 2024
Flemington, PA
Bid Date: Feb 20 2024
Flemington, PA
Bid Date: Aug 21 2024
Flemington, PA
Bid Date: Sep 08 2022
Pittsburgh, PA
Bid Date: Jul 05 2023
Jersey Shore, PA
Bid Date: Jul 13 2023
Drums, PA
--
Ringtown, PA
Bid Date: Jul 13 2023
Cranberry Township, PA
Bid Date: Jul 25 2023
Hollidaysburg, PA
Bid Date: Jul 13 2023
Hummelstown, PA
Bid Date: Jul 11 2023
Bedford, PA
Bid Date: Jul 26 2023
Elmhurst Township, PA
Bid Date: Jul 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.