Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Demolition, site work, paving and new construction of a mixed-use development in Roaring Bk Tp, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project Consists of Replacement of the Existing Stone Masonry Arch Culvert Carrying Sr 307 Over Stafford Meadow Brook With Approach Roadway Improvements. The Proposed Structure Will Be Single Span Prestressed Concrete Spread Box Beam Bridge With Four 11 Foot Lanes and 8 Foot Shoulders. Other Work Includes Roadway Approach Pavement Reconstruction and Shoulder Widening, Guide Rail Replacement, E&s Control Measures, Signing and Pavement Marking, Existing Structure Removal, and Other Miscellaneous Construction Work. Construction of the Sr 307 Bridge Will Be Completed Using Staged Construction While Maintaining One Lane of Traffic in Each Direction. Additional Work Includes Two Driveway Relocations and Mill and Overlay of Sr 307 at the Project Extents, as Indicated on the Approved Drawings Included in the Bid Package for State Route 307, Section D53, in Lackawanna County, Roaring Brook Township From Approximately 4.4 Miles North of Sr 690 at Nb Segment 0150 Offset 1147 to Approximately 2.4 Miles South of Interstate I-81 at Segment 0180 Offset 1340. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE: 0% Structure Work: 33.00% Pre-bid Meeting: None Anticipated NTP: 08/31/2026 Wage Rates: Yes Required Completion: 09/27/2028 Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 307 Over Williams Bridge Reservoir *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$5,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
70
Bidding Soon
2,691
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2026

August 31, 2026

Project location map

PA-307, Roaring Bk Tp, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.