BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Cass Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

This Partial Design/build Project Involves Full Depth Pavement Reconstruction, Safety Improvements Including Realignment of Several Substandard Curves, Installation of a Traffic Signal at Darkwater Road, Wider Shoulders, Reconstruction and/or Rehabilitation of Eight Culverts and Four Retaining Walls, Design/build Bridge, Slope Stabilization, Design/build Temporary Signal, Its Devices, Sign Structure, Design/build Ada Curb Ramps and Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 61, Section 14m, in Schuylkill County, Townships of New Castle, Bltyhe, Ryan & West Mahanoy, Boroughs of Saint Clair and Frackville From Segments 0432/0433 Offsets 0342/0342 to Segments 0470/0471 Offsets 0908/0908, From Segment 0470 Offset 0908 to Segment 0490 Offset 0824 and From Segments 0490/0491 Offsets 0824/0827 to Segments 0500/0500 to Offsets 0016/0016. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 17.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PennDOT - RFP D/B - 61 Reconstruction Saint Clair - Frackville

Award

Roads / Highways

$115,574,431.00

Public - State/Provincial

Paving, Site Work

1994

18

1092

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
94
Bidding Soon
1,485
All Active Projects
695
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

April 1, 2024

img_map_placeholder

PA-61, Cass Township, PA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.