BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 25, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and new construction of a mixed-use development in Sacramento, California. Design plans call for the construction of a museum; for site work for a playground / park / athletic field; for paving for a sidewalk / parking lot; and sidewalk / parking lot.

Scope: museum's new art park, The project would include construction of an art-focused park with gallery and event space at Crocker Park, a 3-acre open space across from the museum. As of May 2022, the design phase has been completed, and the owner is working on a memorandum with the city. A ground breaking is expected in the fall of 2022. Information regarding a general contractor or selection method has not been disclosed. A firm construction timeline has not been established.

Design

Museum

$40,000,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
24
Bidding Soon
1,781
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2022

Project location map

211 O St, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.