BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and renovation of a bridge / tunnel in San Francisco, California. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 3, 2021, this project is in funding. The general contractor hopes to start construction by the end of the year. Project is located on Treasure Island Road on Yerba Buena Island between I-80 and Macalla Road. Project consists of reconstructing the Westside Bridges Only written inquiries will be accepted: San Francisco County Transportation Authority Attention: Steve Stamos, Management Analyst 1455 Market Street, 22nd Floor San Francisco, California 94103 e-mail: steve.stamos@sfcta.org The YBI Westside Bridges (Project) encompasses eight existing bridge structures on the west side of YBI. These structures generally comprise a viaduct along Treasure Island Road, just north of the San Francisco-Oakland Bay Bridge (SFOBB). The Project limits along Treasure Island Road are from the SFOBB to approximately 2000-feet northward. This stretch of Treasure Island Road includes the bridge structures and portions of at-grade roadway. The project purpose is to bring the bridge structures up to current seismic safety standards. To accomplish this, five structures will be seismically retrofitted, and three structures will be demolished and replaced with realigned roadway, an overcrossing structure, and new retaining walls. The Transportation Authority will use a single-phase procurement process to select a CMGC to deliver the Project. This procurement process consists of issuing this RFQ to solicit SOQs from qualified contractors. The Transportation Authority will advertise the project to the general public, and all interested and qualified contractors will receive an RFQ. The Transportation Authority will not shortlist qualified contractors as a precursor to issuing the RFQ. The procurement process will include the following: A) Procurement This RFQ is issued as part of the single phase to solicit information, in the form of SOQs that the Transportation Authority will evaluate to determine which Proposers are qualified to successfully deliver the Project in a two-phase contract with a Contractor. The CMGC contractor is awarded a two-phase contract for the CMGC project and is responsible for providing preconstruction services under the first phase and, if a price agreement is reached, construction services under the second phase of such contract. B) Contract Phases 1. Phase one - Pre-construction: A "Pre-Construction Services" contract which covers the intended professional services to be provided by the Contractor to assist with the design of the Project. This phase will utilize a Preconstruction Services Phase consulting contract for professional services. The Preconstruction Services Contract will be a reimbursement contract in an amount not to exceed $675,000. 2. Phase two - Construction: A "Construction Contract" to build the Project. This phase will utilize a construction contract to build the project. During this phase the Contractor will serve as the general contractor for the project. The Contractor must self-perform at least 30%, but not more than 70%, of the work during construction phase of the project. The Transportation Authority may issue one comprehensive work package contract for construction of the Project or the Transportation Authority may issue multiple work packages for construction of the Project. The Engineer's cost estimate is approximately $55,300,000. The Project is funded through the Federal Highway Bridge Program. There is no Disadvantaged Business Enterprise (DBE) goal established for the Pre-construction Phase of the Project, but a DBE goal will be established during the Pre-construction phase for the Construction Phase of the Project. The Transportation Authority highly encourages DBE and Small Business Enterprise participation during both Phases. A Class A contractor license is required and the successful proposer must pay prevailing wages. Questions due by July 24, 2018 at 5:00 p.m. Questions may be submitted in writing by e-mail to info@sfcta.org; please include "RFQ 17/18-12 YBI Westside Bridges CMGC" in the subject line. The Transportation Authority's responses will be posted on this page by July 30, 2018, and any addenda to the RFQ will be made available on this page prior to the SOQ due date. YBI Westside Bridges Additional Project Documentation Environmental Documents and Technical Reports/Memorandums Geotechnical Information including Log of Test Borings Preliminary Geometric Plans Preliminary Structures Plans for Bridge Retrofits Preliminary Structural General Plan Sheets for New Structures Design Cross-sections As-builts for existing bridges

Award

Bridges / Tunnels

$675,000.00

Public - County

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
82
Bidding Soon
1,799
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2018

November 15, 2021

img_map_placeholder

Treasure Island Rd, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.