Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 13, 2020 at 7:00 PM
Updated October 24, 2023
Site work, paving and renovation of a bridge / tunnel in Parker, Arizona. Completed plans call for the renovation of a bridge / tunnel; and for paving for a bridge / tunnel.
Overview The Arizona Department of Transportation (ADOT) and La Paz County are rehabilitating the Farmers Bridge to improve safety, accessibility and traffic flow to the community of Cibola and its surrounding agricultural communities. The Farmers Bridge was constructed in 1981 with funds by local farmers. The $1,460,000 bridge rehabilitation project includes removing and replacing existing bridge railing and roadway approach guardrail, construction of new concrete end blocks, repair and reinforcement of abutment cap beams, installation of steel decking, polymer epoxy deck overlay, asphalt paving, storm drain, signing and other related work. ADOT is performing the work on behalf of La Paz County, which owns the bridge. Project Area The project is located in Imperial County, California, 13.3 miles south of Interstate 10 in Blythe, CA,and 2.3 miles north of the community of Cibola in La Paz County where the bridge spans the Colorado River. What to expect: The Arizona Department of Transportation advises drivers to plan for the temporary full closure of Farmers Bridge. The closure, already in place, is scheduled through Sunday, April 25. Drivers should plan to use detour routes and allow extra travel time while the temporary closure is in place. North and southbound traffic will be detoured on CA HWY 78 to Oxbow Bridge. As of November 13, 2020 work in underway. An awarded designer and contractor are unknown. Completion of the project is scheduled for spring 2021. *Project information, including timeline and contacts, has been obtained through public sources. Architect and/or general contractor involvement has not been confirmed. The Editorial Content Team is working toward contact confirmations. Inquiries should be directed to the contact(s) listed.
Under Construction
Bridges / Tunnels
$1,500,000.00
Public - State/Provincial
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2020
To Be Determined, Parker, AZ
Related To This Project
Parker, AZ
--
Parker, AZ
Bid Date: Jul 11 2022
Parker, AZ
Bid Date: Jul 11 2022
Parker, AZ
Bid Date: Jul 11 2022
Parker, AZ
Bid Date: Jul 08 2022
Parker, AZ
Bid Date: Jun 10 2022
Parker, AZ
Bid Date: Aug 15 2022
Parker, AZ
Bid Date: Sep 02 2022
Parker, AZ
Bid Date: Feb 20 2019
Parker, AZ
Bid Date: Oct 26 2022
Glendale, AZ
Bid Date: Sep 29 2022
Mesa, AZ
Bid Date: Nov 01 2022
Parker, AZ
Bid Date: Feb 20 2019
Gilbert, AZ
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
