BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a bridge / tunnel in Parker, Arizona. Completed plans call for the renovation of a bridge / tunnel; and for paving for a bridge / tunnel.

Overview The Arizona Department of Transportation (ADOT) and La Paz County are rehabilitating the Farmers Bridge to improve safety, accessibility and traffic flow to the community of Cibola and its surrounding agricultural communities. The Farmers Bridge was constructed in 1981 with funds by local farmers. The $1,460,000 bridge rehabilitation project includes removing and replacing existing bridge railing and roadway approach guardrail, construction of new concrete end blocks, repair and reinforcement of abutment cap beams, installation of steel decking, polymer epoxy deck overlay, asphalt paving, storm drain, signing and other related work. ADOT is performing the work on behalf of La Paz County, which owns the bridge. Project Area The project is located in Imperial County, California, 13.3 miles south of Interstate 10 in Blythe, CA,and 2.3 miles north of the community of Cibola in La Paz County where the bridge spans the Colorado River. What to expect: The Arizona Department of Transportation advises drivers to plan for the temporary full closure of Farmers Bridge. The closure, already in place, is scheduled through Sunday, April 25. Drivers should plan to use detour routes and allow extra travel time while the temporary closure is in place. North and southbound traffic will be detoured on CA HWY 78 to Oxbow Bridge. As of November 13, 2020 work in underway. An awarded designer and contractor are unknown. Completion of the project is scheduled for spring 2021. *Project information, including timeline and contacts, has been obtained through public sources. Architect and/or general contractor involvement has not been confirmed. The Editorial Content Team is working toward contact confirmations. Inquiries should be directed to the contact(s) listed.

Under Construction

Bridges / Tunnels

$1,500,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
31
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2020

img_map_placeholder

To Be Determined, Parker, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.