BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work and paving for a sidewalk / parking lot in Aberdeen, Washington. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

HMA inlay and upgrade curb ramps. Pavement condition rating is projected to drop below the adopted standard. By inlaying the existing roadway with hot mix asphalt, the existing pavement condition rating will be increased to be within adopted standards. ADA curb ramps do meet current ADA standards. Upgrading curb ramps to current standards will improve pedestrian access and has the potential to improve safety. ADA curb ramps do not meet current ADA standards. Upgrading curb ramps to current standards will improve pedestrian access and has the potential to improve safety. As of October 1 , 2025, the project is in Conceptual status. Anticipated letting Year is 2028. WSDOT - SR 105/Westport Rd to Scott St - ADA Compliance *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$476,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
79
Bidding Soon
1,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2028

Project location map

SR 105, Aberdeen, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.