BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2019 at 8:00 PM

Updated September 26, 2025

Site work and paving for a road / highway in Rockville, Indiana. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of April 5, 2019, a design team has been selected. Construction is anticipated to begin in November 2022. Closed solicitation has been included below for reference. ............... Owner Office Vincennes District / Construction Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 8.3% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 Item Description : Project Development Services Pavement replacement includes one construction contract including a single DES to replace the concrete pavement on US 41 from the Lloyd Expressway (SR 62/SR 66) north to Lynch Rd Item Work Description : Selected firm shall provide the following services for this project: Engineer's Report, Environmental Document Preparation, Topographic Survey, Design & Plan Development, Waters Report, Waterway Permits, Right-of-Way Plan Development, Title Research, Utility Coordination, and Construction Phase Services. Additional assessment of the pavement on US 41 from the Lloyd Expressway (SR 62/SR 66) north to Boonville-New Harmony may also be included in this contract. Other services, such as Hydraulics Analysis, Ecological Surveys, Wetland Mitigation, Archaeological Investigations, Historical/Architectural Investigations, Karst Studies, Geotechnical Engineering, Traffic Signal Design, Traffic Signal System Design and Lighting Design may be included later if these work types become necessary. INDOT will provide Real Estate Acquisition Services and Pavement Design. The selected consultant's fee proposal shall be due 45 calendar days after the selection date for this RFP item. These contracts will utilize INDOT`s eInvoice application. Des Work Description : Des # DES Work Description Est. Construction Amount 1601066 US 41' Pavement Replacement, From SR 66/62 (Lloyd) to 0.74 mi N of SR 66, N Jct. (Diamond Ave.), in Vanderburgh Co. RP 003+081 to RP 006+014 $20,000,000.00 Deliverables Letting date for construction contract R-41410. RFC will be early November 2022 and Final Tracings will be due mid-September 2022. Deliverable Due Date : 01/19/2023 Prequalification Required: Yes The method of contractor selection has not been determined at this time. INDOT - Project Development Services Pavement Replacement

Design

Roads / Highways

$20,000,000.00

Public - State/Provincial

Paving, Site Work

9

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
130
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

Project location map

US-41, Rockville, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.