Site work and paving for a mixed-use development in Manhattan Beach, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bid Valid 90 Days Liquidated Damages $1,000 per day Estimated Bid Value $420,000 Start/Delivery Date June 2023 Project Duration 60 Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 01/17/2023 11:00 AM (PST) The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of BIDS. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. The Rowell Avenue Sidewalk Gap Closure Between 1st St and Curtis Ave (P-922) is a Public Works construction project to install new sidewalk and ADA ramps in front of Pennekampe Elementary School. The work includes, but is not limited to, constructing 3,800 square feet of 4" thick PCC sidewalk, 6 new ADA curb ramps, 800 linear feet of new variable height curb, 640 linear feet of new variable height curb and gutter, 1,525 square feet new 8" thick PCC cross gutter, 1,060 square feet 8" thick PCC driveway, 52 TN install 6" thick asphalt, 200 LF paint curb, remove and relocate/replace existing handrails, remove and relocate existing chain gate bollards, install city furnished water meter vault including cutting mouseholes, adjust to grade utilities, remove/relocate or replace signs/post, remove crosswalk striping, install new crosswalk striping, install vehicle feedback signs, remove landscape and trees, install landscaping and irrigation, and traffic control measures. Anticipated City Council award of contract date: 2/21/23 Time of Completion: 60 total working days (which exclude weekends and City Holidays), including pre-construction requirements. Special Instructions: All onsite work shall be performed during the 2023 Manhattan Beach Unified School District Summer School Break, starting no sooner than June 19, 2023 and ending no later than August 18, 2023, unless otherwise approved by the City which is no more than 44 workings days onsite Pertinent Project Information: All areas of work are to remain open and accessible to pedestrian traffic per regulatory agency requirements during construction. The City does not have any readily available staging area; it is therefore the Contractor's responsibility to procure a staging area at his/her expense. Notes The bidder is solely responsible for on time submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time stamp from the Bid Management System indicating that the bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may contact at (818) 992-1771. Neither the City, makes any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission deadline. The service is provided so City staff can efficiently provide information online in an organized and timely manner for the benefit of our vendors to access the information. With the services provided through portal, the vendors are now able to obtain the applicable information 24/7 on-line at their convenience and can submit proposals, quotes, and bids in an easy, efficient streamlined way in order to successfully do business with the City. The benefits to the vendors include not having to send their staff to the City to submit a proposal or bid, respond to bid opportunities securely over the internet, automatic addendum notification and acknowledgments, and secure eBidding - including line itemization, calculation with net terms, etc.

Award

Sidewalks / Parking Lot

$547,970.00

Public - City

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
94
Bidding Soon
2,204
All Active Projects
969
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

June 19, 2023

img_map_placeholder

N Rowell Ave, Manhattan Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.