BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Site work for a water / sewer project in Gaithersburg, Maryland. Design plans call for site work for a water / sewer project.

Update:The project includes stream restoration of approximately 930 linear feet for reconnecting, grading, stabilizing, realigning, and repairing existing stream channels.The project comprises two locations, Sites 2012-1a and 2012-2 per the Middle Great Seneca Creek Watershed Study. Site 2012-1a, at 100% design, includes a total of 300 linear feet of stream upstream from Victory Farm Dam. Site 2012-2, at 30% design, includes about 600 linear feet of stream downstream from the dam. The intent is to implement restoration to the maximum extent possible with minimal tree impact.The potential credit achievement has been estimated at 3-9 credits. This project is expected to be constructed with the Victory Farm Pond Retrofit project (SW00005). Schedule Impacts: Preliminary outreach was conducted in FY21.Due to a reprioritization of projects, further outreach and the final design of Site 2012-2 have been rescheduled to FY27 with construction planned for FY28-FY29 to coordinate with related projects SW00005 and SW00020. Project is included in City of Gaithersburg Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope has not been identified. This project is included in the city’s fy 2025-2028 Capital Improvement Program. As of May 29, 2025, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$310,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
214
Bidding Soon
3,081
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

Girard St, Gaithersburg, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.