BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and new construction of a mixed-use development in West Palm Beach, Florida. Completed plans call for the construction of a 8,500-square-foot clubhouse / community center; and for the demolition of a clubhouse / community center.

As of May 18, 2026 project was awarded to Shiff Construction & Development, awarded amount is $7,325,497.28 The City of West Palm Beach is soliciting bids from experienced, qualified and responsible contractors to furnish and assume full responsibility for the complete and proper demolition and removal of existing pavement, sidewalks, shuffle board courts, canopy area, buildings and renovation and construction of a new community center at Howard Park. Project Name: Howard Park Community Center, located at: 1302 Parker Ave., West Palm Beach, FL. 33401 Summary Project Description :Enclosed pavilion area and portions of the covered walkways in the existing community center to remain. (See Pavilion Renovation Plans) Removal/demolition of the existing exterior pavement located on the south end of the existing community center. Removal/demolition of existing concrete sidewalks (See Existing Site Demolition Plan). 1. Demolition: Removal/Demolition of existing shuffle board courts & covered canopy areas. Removal/Demolition of stand-alone building between the shuffle board courts and the existing community center. Removal/Demolition of portions of the existing community center (See Demolition Plans). 2. Renovation: Retain the existing truss system located in the enclosed pavilion space in the existing community center. Modify the truss system by removing the projecting portion at the top of the truss (See Pavilion Detail Plans). Removal of existing glass walls to create an open pavilion space. Repair modified roof as needed. Remove existing flooring tiles and resurface existing concrete pad. Remove existing light fixtures and replace with new light fixtures. Renovation of existing men's & women's restrooms at east and west side of pavilion. 3. New Construction: Proposed new community center approx. 8,500 SF to be built just south of the west parking lot. (See Site Plan). Community center to have multipurpose rooms, restrooms, open seating areas, café area, staff office area, kitchen, and other ancillary spaces (janitorial room, IT room, storage room). Self-Performance Requirement: The selected Contractor shall be required to commit to and self-perform twentyfive percent (25%) of the work (labor) on the Project. pn-23110 Final Questions Due February 26, 2026 Questions or requests for information regarding this solicitation, should be addressed only to: City of West Palm Beach Procurement Division - 5th Floor 401 Clematis Street - City Hall West Palm Beach, FL 33401 Sharon Sepulveda, Senior Procurement Specialist Email: procurement@wpb.org Direct: 561.494.1056 Main: 561.822.2100 TTY: 800.955.8771 The City of West Palm Beach (the "City") is accepting bids from experienced, qualified and responsible Contractors to furnish and assume full responsibility for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), materials, equipment, machinery, tools, transportation, delivery, disposal of waste and surplus material, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other appurtenances and incidentals necessary for the furnishing, performance, testing, start-up and successful completion of the Work as shown on the Construction Drawings set forth in Exhibit A1 and Exhibit A2 and associated Project Manual set forth on Exhibit B, including the costs for all supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit for the complete and proper demolition/removal of existing pavement, sidewalks, shuffle board courts, canopy area, buildings and renovation and construction of a new community center at Howard Park. Final Questions Due February 26, 2026 March 9, 2026

Award

Playgrounds / Parks / Athletic Fields

$7,325,497.00

Public - City

Demolition, New Construction, Site Work

198

32

45

7

Subscribe For Documents

174 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
141
Bidding Soon
2,169
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

June 10, 2026

Project location map

1302 Parker Ave, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.