Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Marion, Ohio. Completed plans call for the renovation of a 25,162-square-foot, two-story above grade educational facility.
This project is in the conceptual phase. As of November 6, 2018, the owner has not selected an architect and a timeline for award has not been established. Although a firm timeline for construction has not been determined, construction is not expected to begin before September 2019. Trade Estimate General Contract........................................................$1,848,936.00 Alternate A-1: Office Area Renovation....................$ 116,647.00 Alternate A-2: Add Exterior Windows ....................$ 45,915.00 Alternate A-3: Storage Room Full Glass Door........$ 4,818.00 Alternate A-4: Multi-Purpose Rm. Wood Floor .....$ 15,667.00 *The closed solicitation has been included below for reference: Submit all questions regarding this RFQ in writing to Rick Van Deusen at van-deusen.2@osu.edu with the project number included in the subject line (no phone calls please). The Alber Student Center was built in 1986 and is the campus crossroads for OSU Marion and Marion Tech student life. The facility functions as the primary location for students to socialize, recreate and engage in wellness activity. The goal of the project is to attract and engage current and potential students by creating a welcoming environment with natural light and student centric spaces. The renovation includes an approximately 17,000 sq ft reorganization of office, wellness, fitness, student organization gathering, activity spaces and new food service with interior and exterior dining space. Planning is to include locations for primary and secondary building additions with exterior connectivity. The method of contractor selection has not been determined at this time.
Award
Educational
$1,494,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2020
May 18, 2020
1463 Mt Vernon Ave, Marion, OH
Related To This Project
Marion, OH
Bid Date: Sep 13 2022
Marion, OH
--
Marion, OH
Bid Date: Nov 09 2023
Marion, OH
Bid Date: Oct 19 2023
Marion, OH
Bid Date: Oct 17 2023
Marion, OH
Bid Date: May 28 2021
Marion, OH
--
Marion, OH
Bid Date: Jan 11 2024
Marion, OH
Bid Date: May 11 2021
Marion, OH
Bid Date: Feb 18 2022
Marion, OH
Bid Date: Mar 24 2022
Marion, OH
Bid Date: Mar 11 2022
Marion, OH
Bid Date: Mar 18 2022
Marion, OH
Bid Date: Mar 29 2022
Marion, OH
Bid Date: Feb 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.