BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Marion, Ohio. Completed plans call for the renovation of a 25,162-square-foot, two-story above grade educational facility.

This project is in the conceptual phase. As of November 6, 2018, the owner has not selected an architect and a timeline for award has not been established. Although a firm timeline for construction has not been determined, construction is not expected to begin before September 2019. Trade Estimate General Contract........................................................$1,848,936.00 Alternate A-1: Office Area Renovation....................$ 116,647.00 Alternate A-2: Add Exterior Windows ....................$ 45,915.00 Alternate A-3: Storage Room Full Glass Door........$ 4,818.00 Alternate A-4: Multi-Purpose Rm. Wood Floor .....$ 15,667.00 *The closed solicitation has been included below for reference: Submit all questions regarding this RFQ in writing to Rick Van Deusen at van-deusen.2@osu.edu with the project number included in the subject line (no phone calls please). The Alber Student Center was built in 1986 and is the campus crossroads for OSU Marion and Marion Tech student life. The facility functions as the primary location for students to socialize, recreate and engage in wellness activity. The goal of the project is to attract and engage current and potential students by creating a welcoming environment with natural light and student centric spaces. The renovation includes an approximately 17,000 sq ft reorganization of office, wellness, fitness, student organization gathering, activity spaces and new food service with interior and exterior dining space. Planning is to include locations for primary and secondary building additions with exterior connectivity. The method of contractor selection has not been determined at this time.

Award

Educational

$1,494,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
65
Bidding Soon
1,147
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2020

May 18, 2020

img_map_placeholder

1463 Mt Vernon Ave, Marion, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.