Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a laboratory facility in Edmonton, Alberta. Conceptual plans call for the construction of a 470,000-square-foot, five-story above grade, one-story below grade laboratory facility; for site work for a laboratory facility; and laboratory facility.
The intent of the Edmonton Lab Hub (ELH) is to provide a new laboratory hub on Government of Alberta land south of the Neil Crawford Center on 113 Street and 65 Avenue. The project contains office spaces, analysis and research laboratories including Level 3 laboratories, visitor parking, circulation roadways and landscaping, on site storm water management systems, specialty building systems such as cogeneration and other sustainable technologies, heated loading docks for fleet vehicles, laboratory fixtures and equipment including owner supplied, contractor installed items. The project includes a consolidation of 7 labs in the Edmonton area, much which are currently over capacity. Testing is currently conducted by Alberta Health Services, Covenant Health, and DynaLife. The new medical lab hub will allow all testing to be done under one roof and allow the testing process to be streamlined. The facility will provide leading edge diagnostics, quality, innovation and efficiency for laboratory operations, research and teaching associated with it. The lab will provide the backbone of all clinical, educational and research functions within their information management and information technology systems that impacts requisitioning and results reporting, laboratory operations software that optimizes flow of work between short term and long-term storage, and sequencing and analyzing of DNA and RNA from various sources. The approved construction budget is $348,000,000 (including escalation and contingencies). The construction schedule is from February 15, 2019 through November 2, 2021. The project has been mandated to achieve LEED Silver certification. PCL Construction Management Inc. (PCL) invited pre-qualification submissions from sub-trade contractors to pre-qualify for BP #1, #2 & #3. Successful short-listed pre-qualified Trade Contractors will be invited to participate in the Lump Sum Tender for their relevant scope of work. The approved construction budget is $348,000,000 (including escalation and contingencies). Lump Sum Tender for BP#1 (TP#1) - (Site Utilities, Excavation, Backfill, Shoring & Piling) is (November 22, 2018 - December 06, 2018) Construction Value: $5,330,000.00 Lump Sum Tender for BP#2 (TP#2) - (All substructure work, up to main floor and Waterproofing exterior walls & weeping tile) is (February 20, 2019 - March 06, 2019) Construction Value: $35,900,000.00 Lump Sum Tender for BP#3 (TP#3) - (Concrete superstructure and All structural steel) is (May 09, 2019 - May 23, 2019) Construction Value: $39,500,000.00 Construction manager has invited trades for Bid Package 01 (Excavation & Backfill, Piling & Shoring, and Civil Works). ONLY Invited trades have received copies of the bid package. **Project was has been cancelled and will not be moving forward. Coverage has been discontinued.
Project Abandoned
Laboratories
Public - State/Provincial
LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2018
January 14, 2020
To Be Determined, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Feb 07 2019
Edmonton, AB
Bid Date: May 10 2018
Edmonton, AB
Bid Date: Jan 29 2018
Edmonton, AB
Bid Date: Jul 04 2024
Edmonton, AB
--
Edmonton, AB
--
Edmonton, AB
Bid Date: Jul 25 2024
Edmonton, AB
Bid Date: Jul 23 2024
Edmonton, AB
Bid Date: Jul 23 2019
Edmonton, AB
Bid Date: Aug 08 2019
Edmonton, AB
Bid Date: Mar 14 2019
Edmonton, AB
Bid Date: Jul 25 2019
Edmonton, AB
Bid Date: Oct 28 2020
Edmonton, AB
Bid Date: Dec 01 2020
Edmonton, AB
Bid Date: Dec 15 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.