BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2019 at 8:00 PM

Updated April 17, 2025

Demolition, site work, renovation and addition to a mixed-use development in San Pablo, California. Completed plans call for the addition of a 4,000-square-foot fitness / recreation center; for the renovation of a 51,700-square-foot, two-story above grade fitness / recreation center; 13,200-square-foot educational facility; for site work for a educational facility; educational facility; for the demolition of a educational facility; fitness / recreation center; and fitness / recreation center.

The Contra Costa College PE Complex project consists of the renovation of four buildings plus an addition to the existing gym and related site work. Gymnasium: Existing 18,400 SF concrete building. Seismic upgrade, new wood floors, new bleachers, added HVAC system, modernize/replace existing building systems. New addition of 4,000SF structural steel lobby, classroom, and restrooms. Gym Annex: Existing 33,300SF, 2-story concrete building. Modernize/replace existing building systems and finishes including HVAC, electrical, building envelope, and ADA upgrades. Womens Locker: Existing 4,500SF, 1-story, wood framed building. Structural upgrades, modernize/replace existing building systems and finishes including HVAC, electrical, building envelope, and ADA upgrades. Mens Locker: Existing 8,700SF, 1-story, wood framed building. Structural upgrades, modernize/replace existing building systems and finishes including HVAC, electrical, building envelope, and ADA upgrades Pre-Bid RFIs Due: February 28, 2019 (prior to 5:00pm) Buildings are currently occupied. Contractor is not to disturb occupants or enter locker rooms except at designated dates and times. In addition to the pre-bid meeting, buildings will be open to contractors and subcontractors to examine existing conditions on the following dates/times: Friday, February 22, 2019 11:00 AM to 1:00 PM Friday, March 1, 2019 11:00 AM to 1:00 PM The District does not provide hardcopies of bid documents or reimburse cost of printing, delivery, or any expenses related to the bidding process. All questions related to this project must be in writing and are directed to: To: Ben Cayabyab - Contracts Manager (CCCCD) Email: bcayabyab@4cd.edu Cc: P.J. Roach - Project Manager (CCCCD) Email: proach@4cd.edu This project is a public works project and is subject to prevailing wage rate laws. The Governing Board of the Contra Costa Community College District reserves the right to reject any and all bids and/or waive any informality or irregularity in any bid received. No bidder may withdraw their Bid for a period of ninety (90) days after the date set for opening thereof.

Award

Fitness / Rec Centers

$24,600,000.00

Public - County

Addition, Demolition, Renovation, Site Work

358

33

107

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
214
Bidding Soon
3,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2019

May 13, 2019

Project location map

2600 Mission Bell Dr, San Pablo, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.