BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Appleton, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 26, 2023, this project is in the design phase with. Design firm information has not been disclosed. It is anticipated bids will commence in February 2024 for specific portions, with construction starting in 2024. The Wisconsin Department of Transportation (WisDOT) is exploring options to improve I-41 in the project limits to address numerous safety and operational issues. The Wisconsin State Budget signed in 2019 provided WisDOT enumeration for construction of this project. This project is considered a Major Highway Project - a complex and costly project which requires a capacity expansion of over five miles or creation of two and half miles of highway on a new location. Major Projects require extensive environmental review, public involvement and typically require approval by the Transportation Projects Commission, the State Legislature and the Governor. More information regarding Major Projects can be found on WisDOT's Major Highway Development webpage. I-41 is a critical backbone route in Wisconsin’s Connections 2030 State Highway Plan and part of the National Highway System. Backbone routes are critical to travel patterns and support the state’s economy. I-41 is a major passenger and freight route connecting the Fox Cities to Fond du Lac and Milwaukee to the south and Green Bay to the north. The corridor provides access to major manufacturing areas, an international airport, educational institutions and universities, regional shopping centers, entertainment districts, and hospitals. The I-41 Project is currently preparing an Environmental Assessment (EA). The environmental documentation process includes development of a project purpose and need, range of alternatives, evaluation and screening of alternatives and identification of a preferred alternative. Numerous factors are considered throughout the environmental document development process including safety, mobility, compatibility with state/regional/local plans, engineering design standards, impacts to the socio-economic, natural and physical environment, cost, and input from the public and state/federal review agencies. Construction is not anticipated to begin prior to 2025.

Design

Roads / Highways

$30,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
31
Bidding Soon
373
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

I-41, Appleton, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.