Published March 13, 2019 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Leesport, Pennsylvania. Completed plans call for site work for a water / sewer project.

The work to be performed for the SR 61 Water Main Crossing Project consists of furnishing all labor, materials, equipment, and appurtenances for the construction of approximately 190 LF of 12" DIP water main, 100 LF of 24-inch cased highway boring, tie to existing main and associated trench restoration located in PennDOT right-of-way and private easements.Proposals shall be effective for sixty (60) calendar days from the date of opening, unless award is delayed by a required approval from a governmental agency, or the award of a grant or grants in which event the bids shall remain effective for a period of sixty (60) days from the date of bid opening. The successful bidder shall complete the project within ninety (90) calendar days from receipt of the Notice to Proceed. Attention is called to the fact that prevailing minimum wage rates as determined by the PA Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. The Borough of Leesport, Owner, hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received.

Award

Water / Sewer

$155,325.00

Public - City

Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Site Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
153
Bidding Soon
2,110
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2019

March 18, 2019

img_map_placeholder

PA-61, Leesport, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SR 61 Water Main Crossing Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.