BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2022 at 8:00 PM

Updated September 14, 2023

Site work and renovation of a water / sewer project in Leesport, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

** As of July 25, 2022 General/Mechanical was awarded to Blooming Glen Contractors, Inc. awarded amount $1,082,700.00. For Electrical it was awarded to Garden Spot Electric Inc., awarded amount is $244,900.00.** Wastewater Treatment Plant Aeration Upgrades Contract No. 2022-01 - General/Mechanical Contract No. 2022-02 - Electrical The Project includes the following Work: Contract No. 2022-01 - SBR system upgrades to the aeration system including selective demolition, new blowers and piping, new diffusers, mixers, valves, site restoration, and successful startup. Contract No. 2022-02 - Selective demolition, variable frequency drives, conduits, duct banks, and successful startup. For all further requirements regarding bid submittal, bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Leesport Borough Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.

Award

Water / Sewer

$1,327,600.00

Public - City

Renovation, Site Work

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
560
Active Projects
303
Bidding Soon
3,287
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

Project location map

10 W Wall St, Leesport, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.