Published March 15, 2019 at 8:00 PM

Updated February 6, 2025

Renovation of an educational facility in Elk River, Minnesota. Completed plans call for the renovation of a educational facility.

This project includes: New exterior loading dock and associated site work and interior renovations. Start submittal process immediately upon contract award by the Board of Education. Actual work on site shall not commence until June 12, 2019. The Owner requires Substantial Completion of the project on or before August 9, 2019. A. Work under this Contract includes: 1. Sitework a. Selective site demolition, erosion and sediment control. b. Rough and finish grading, soils corrections, earthwork. c. Paving, curb and gutter, maintenance strips, concrete sidewalks, ground cover. 2. Building Structure a. Concrete footings, concrete foundation walls, concrete slabs on grade, concrete dock leveler, and miscellaneous metal items including embeds and angles for stairs, corner edges, and metal railings. b. Existing masonry wall retrofit for new and enlarged existing openings. 3. Building Enclosure a. Exterior wall systems of face brick, cavity wall insulation, and metal panels. b. Galvanized hollow metal doors and frames. Sectional metal overhead door. c. Roof patching for new and existing openings. 4. Interior Finishes a. Insulated gypsum board/metal stud partitions. b. Wall finishes of paint, brick, porcelain tile. c. Ceiling finishes of plaster. d. HM doors and frames, hardware, loading dock equipment, miscellaneous specialties. 5. Mechanical Systems a. Plumbing including, supply and waste piping systems, piping insulation, plumbing fixtures. b. Hydronic piping and insulation. c. Ductwork modifications and relocation of existing fan and relief hood. d. Temperature control system. 6. Electrical Systems a. Electrical conduit and wiring. b. Interior and exterior lighting. Parking lot lighting. c. Low voltage work to include: Fire alarm system and access control. d. Fire alarm. 7. Keep Architect fully informed about progress of the work, performance of the work and potential problems.

Award

Educational

$483,200.00

Public - County

Renovation

34

24

19

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
115
Bidding Soon
1,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2019

June 12, 2019

Project location map

900 School St NW, Elk River, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.