BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 7, 2025

Site work and paving for a road / highway in Elk River, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruction of CR 83 from CR 43 to CSAH 15 The Major Quantities of Work are: Remove Pipe Culverts LF 482 Remove Bituminous Pavement SY 44,009 Excavation Common & Subgrade CY 61,603 Select Granular Embankment CY 43,233 Common Embankment CY 12,472 Aggregate Base Class 5 TON 19,594 SP 9.5 & 12.5 Wearing Course Mixture TON 11,133 Pipe Culverts LF 665 Silt Fence LF 6,025 Sediment Control Log; Straw LF 4,979 Seeding AC 18 Hydraulic Matrix LB 48,600 Pavement Markings LF 34,760 All bids shall be accompanied by a bid bond for at least five percent (5%) of the amount of the bid. No bidder may withdraw their bid (which shall include the bid bond) within 15 days of the scheduled bid submittal date The County Board reserves the right to reject any or all bids and to waive minor irregularities. The County Board will consider award of the contract at the February 4, 2025 County Board Meeting contingent upon County Engineer & County Attorney review. It is the County's intent to have construction activities begin late May 2025 and be completed by the end of August 2025. The County Board reserves the right to reject any or all bids & waive informalities.

Award

Roads / Highways

$2,429,681.00

Public - County

Paving, Site Work

116

9

5

6

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
125
Bidding Soon
1,496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

March 3, 2025

Project location map

Multiple Locations, Elk River, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.