Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work and paving for a transportation facility in Port Townsend, Washington. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
**As of July 28, 2025, project was awarded to C.R. Contracting, awarded amount is $509,899.03** PORT OF PORT TOWNSEND is seeking a qualified contractor to construct the Apron, Taxiway, and Taxilane Pavement Rehabilitation Project at Jefferson County International Airport. Major elements of work for the project include crack sealing, fog sealing, and new pavement marking. The PORT OF PORT TOWNSEND encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The PORT OF PORT TOWNSEND is an equal opportunity and affirmative action employer. Small, minority, veteran, and women-owned businesses are encouraged to submit bids. The PORT OF PORT TOWNSEND has a DBE contract goal of 6.73% in compliance with their 49 CFR Part 26 program. The goal is a contractual obligation, and the CONTRACTOR is directed to refer to the PORT OF PORT TOWNSEND for a copy of the Disadvantage Business Enterprise Program and goal methodology. The bidder shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26, to meet the contract goal for DBE participation in the performance of this contract. No bid for a construction contract shall be received or considered by the Port of Port Townsend unless the Bidder is registered with the Washington State Department of Licenses, as required by RCW 18.27. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Transportation Terminals
$509,899.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
June 30, 2025
191 Airport Cutoff Rd, Port Townsend, WA
Related To This Project
Port Townsend, WA
Bid Date: Jun 11 2025
Port Townsend, WA
--
Port Townsend, WA
--
Port Townsend, WA
Bid Date: Jun 18 2025
Port Townsend, WA
Bid Date: Jun 11 2025
Port Townsend, WA
Bid Date: Jul 21 2025
Port Townsend, WA
Bid Date: Jul 23 2025
Port Townsend, WA
Bid Date: May 29 2025
Port Townsend, WA
Bid Date: May 16 2025
Port Townsend, WA
Bid Date: Apr 30 2025
Port Townsend, WA
Bid Date: Apr 23 2025
Port Townsend, WA
--
Port Townsend, WA
Bid Date: Mar 14 2025
Port Townsend, WA
Bid Date: Jan 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
