Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 24, 2019 at 8:00 PM
Updated August 15, 2025
Site work and paving for a mixed-use development in Holly Springs, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
** As of May 8,2019 this project has not yet been awarded. The project is expected to be awarded on May 28,2019. Estimated Budget: $3,000,000.00-$3,500,000.00 Construction Consisting of, but Not Limited to, Grading, Drainage, Concrete Curb & Gutter, Concrete Sidewalk, Base & Paving, Pedestrian Lighting for Widening on Hickory Road and Palm Street; Including the Addition of a Roundabout in the City of Holly Springs, Georgia. All engineering and technical questions should be directed to Jacob Hughes, P.E., BM&K Construction & Engineering Consultant City Engineer, at iacob@bmandkinc.com The time allowed for Substantial Completion is 365 consecutive calendar days from the date specified in the Notice to Proceed. Nonrefundable liquidated damages in the amount of $1000 per calendar day will be deducted from monies due the Contractor in the event that a portion of the work remains incomplete beyond the agreed upon contract completion date. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish a performance bond for 100% of the contract amount and a payment bond for 100% of the contract amount, with the executed Agreement meeting the requirements ofthe Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the Fifth (5fh) ofthe month for the payment by the Twentieth (20th) of the month less 10% retainage. Retainage will be held until final acceptance ofthe project by the City of Holly Springs. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. All work performed for this project shall be in accordance with Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges, 2013 Edition, or current edition and attached modifications and special provisions. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. No other determination of award will take place at the bid opening. Proposals received after the designated time will not be considered. If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the Owner. The mailing address is P.O. Box 990 Holly Springs, GA 30142. Each proposal must be submitted in a Sealed Envelope, addressed to the Owner.
Award
Roads / Highways
$3,224,316.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2019
July 1, 2019
Palm St & Hickory Rd, Holly Springs, GA
Related To This Project
Holly Springs, GA
Bid Date: Sep 19 2025
Holly Springs, GA
Bid Date: Oct 10 2025
Holly Springs, GA
Bid Date: Oct 10 2025
Holly Springs, GA
Bid Date: Oct 24 2025
Holly Springs, GA
Bid Date: Dec 23 2025
Holly Springs, GA
Bid Date: Jul 18 2025
Holly Springs, GA
--
Holly Springs, GA
Bid Date: Jun 17 2025
Holly Springs, GA
Bid Date: May 30 2025
Holly Springs, GA
Bid Date: May 13 2025
Holly Springs, GA
Bid Date: Mar 07 2025
Holly Springs, GA
Bid Date: Jan 09 2025
Holly Springs, GA
Bid Date: Mar 24 2025
Holly Springs, GA
Bid Date: Dec 13 2024
Holly Springs, GA
Bid Date: Aug 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
