Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 26, 2026 at 7:00 PM
Updated February 27, 2026
Site work and new construction of a municipal facility in Holly Springs, Georgia. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
The City of Holly Springs, Georgia (Owner) is seeking qualifications from Construction Managers at Risk (CMAR) for value engineering/GMP and construction services for the Holly Springs City Hall. The project site is located at 130 Timothy Downing Drive, Holly Springs, GA 30115. The principal items of this project include the construction of the Holly Springs City Hall. The total project budget is $19.25 million, inclusive of value engineering, GMP, construction, furniture, fixtures, and equipment (FF&E), contingency, and other associated costs. The construction manager at risk will be evaluated and selected through a qualificationbased selection process. A full RFQ Package stating the full response requirements can be obtained from Dana McKinzie via email at dmckinzie@hollyspringsga.us. Only responses submitted by firms on record with the City of Holly Springs as having received the RFQ Package will be opened. The Holly Springs Town Center Project (TCP) is in historic downtown Holly Springs, Georgia. The TCP was the vision of the Mayor and City Council of Holly Springs approximately twenty years ago when they collectively decided to assemble property in downtown Holly Springs and revitalize the area at the intersection of Holly Springs Parkway, Hickory Road and the Georgia Northeastern Railroad to build a downtown with circa 1900 architecture and amenities to serve the residents of Holly Springs and residents of Cherokee County. Upon completion in 2027, the TCP will include the Holly Springs Amphitheatre, City Hall, multi-family and single-family residential units, multi-purpose buildings with restaurants, retail, and office uses, and a structured parking deck. The City of Holly Springs has engaged CPL Architecture Engineering & Planning to prepare architectural plans and specifications for the Holly Springs City Hall. The City has also engaged the services of a consultant on the audio/visual and security systems of the Holly Springs City Hall. Completed plans and specifications will be delivered to the CMAR upon selection. The CMAR scope of work shall consist of working closely with the City of Holly Springs and CPL Architecture Engineering & Planning (Design Team) to provide services including cost estimates, value engineering, and construction recommendations to facilitate prioritization, refinement and development of the design as required for the project to meet the GMP. The final improvements shall be determined as the value engineering/GMP progresses based on information generated by the Design Team and CMAR and the established construction budget of $19.25 million. Lower priority items may be identified and itemized for consideration to ensure the project is completed within the established construction budget. The CMAR will be responsible for pricing the plans and specifications, value engineering, and maintenance and constructability issues. When the design documents for the project have been value engineered and conformed in sufficient detail, the CMAR, with the support and assistance of the Design Team, will develop and commit to a Guaranteed Maximum Price (GMP) for all construction and site development. No oral interpretations will be made to any firm as to the requirements of the RFQ Package. Requests for interpretation of the RFQ Package shall be made in writing to Dana McKinzie, via email at dmckinzie@hollyspringsga.us no later than Wednesday, May 21, 2025 by 4:00 PM.
Award
Municipal
$21,714,431.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
March 2, 2026
130 Timothy Downing Dr, Holly Springs, GA
Related To This Project
Holly Springs, GA
Bid Date: Jun 17 2025
Holly Springs, GA
--
Holly Springs, GA
Bid Date: Jul 18 2025
Holly Springs, GA
Bid Date: Apr 12 2019
Holly Springs, GA
Bid Date: Sep 19 2025
Holly Springs, GA
Bid Date: Oct 10 2025
Holly Springs, GA
Bid Date: Oct 10 2025
Holly Springs, GA
Bid Date: Oct 24 2025
Holly Springs, GA
Bid Date: May 13 2025
Holly Springs, GA
Bid Date: Mar 07 2025
Holly Springs, GA
Bid Date: Jan 09 2025
Holly Springs, GA
Bid Date: Mar 24 2025
Holly Springs, GA
Bid Date: Dec 13 2024
Holly Springs, GA
Bid Date: Aug 07 2024
Holly Springs, GA
Bid Date: Jul 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
