Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 13, 2019 at 8:00 PM
Updated November 20, 2025
Site work, paving and renovation of a mixed-use development in Saxon, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field; road / highway; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; water / sewer project; and playground / park / athletic field.
As of August 13, this project is under construction and anticipated to end by August of 2020. Campground Reconstruction at Saxon Harbor. The Project consists of selective site demolition as required to perform the work: excavating and hauling soil and hauling, spreading, and compacting borrow to attain design grades for the construction and placement of roadways, concrete, buildings, utilities, and other campground equipment and facilities. Asphalt and gravel paving including hauling, placement, and compaction of base course, binder, and surface asphalt layers. Cast-in-place concrete will be placed for sidewalks, floor slabs, structural foundations and walls, and other landscaping and storm water management. The work includes installation of water, electric, and sewer utilities to support the campground operations. The work includes installing campground restroom facilities and sanitary sewer holding tank. Site restoration and storm water controls are part of the work and includes finish grading, placing topsoil, seeding, landscaping, installing and maintaining erosion controls, and installing facility storm water systems.
Under Construction
Playgrounds / Parks / Athletic Fields
$2,000,000.00
Public - County
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2019
August 1, 2019
10045 Co Hwy A, Saxon, WI
Related To This Project
Saxon, WI
Bid Date: May 12 2025
Saxon, WI
Bid Date: May 12 2025
Saxon, WI
--
Saxon, WI
--
Saxon, WI
Bid Date: Aug 13 2024
Saxon, WI
Bid Date: Feb 14 2023
Eau Claire, WI
Bid Date: Apr 27 2021
Brule, WI
Bid Date: Jun 22 2021
Eau Claire, WI
Bid Date: May 11 2021
Eau Claire, WI
Bid Date: May 11 2021
Eau Claire, WI
Bid Date: Jun 08 2021
Eau Claire, WI
Bid Date: Jun 08 2021
Eau Claire, WI
Bid Date: Aug 24 2021
Marathon, WI
Bid Date: Jul 22 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
