BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Bear Creek Township, Pennsylvania. Completed plans call for the construction of a 6,600-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

This project consists of the construction of a 6,600 square foot pre-engineered vehicle storage and office building. The project includes but not limited to the excavation, complete construction of the new building, installation of stormwater infrastructure, installation of site utilities, asphalt paving, site restoration, and all materials, labor and equipment necessary for a complete project. The bids must cover all costs for the completion of this project as set forth in the Project Manual. Online sealed bids shall be submitted by way of the Program. Paper bids will not be accepted for this Project. Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same. There is no pre-bid meeting scheduled, but prospective bidders are urged to familiarize themselves with the site and review the scope of work and construction documents. Any contractor who does not do so and submits a bid does so at his own risk. Bids must be submitted unconditionally. No bidder may withdraw bid within SIXTY (60) days after the scheduled closing time for receipt of bids. The Owner reserves the right to waive any informality, or to reject any or all bids. The Pennsylvania Prevailing Wage Act shall apply to this contract. There are no MBE/WBE requirements for this project. Please refer all questions concerning the Bid to Chad M. Lello, P.E., at Pennoni Associates, Inc. via the portal. Questions must be submitted on or before 3/26/2019 12:00 PM Bid Result General Construction Raymond Orchard Const. Inc - $733,000.00 Electrical Construction ADVANCED ELECTRICAL AND COMMUNICATIONS LLC - $145,000.00 Plumbing Construction Richard Pierce Builder Inc. - $126,741.50 HVAC Construction Hynak Air Conditioning & Refrigeration - $156,309.00 Total - $1161051

Bid Results

Municipal

$1,161,051.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
97
Bidding Soon
1,199
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2019

April 29, 2019

img_map_placeholder

PA-115, Bear Creek Township, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.