Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2019 at 8:00 PM
Updated December 6, 2025
Site work, paving and renovation of a bridge / tunnel in Houghton, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the renovation of a bridge / tunnel.
Bridge rehabilitation including healer/sealer, deck patching, full steel cleaning and coating and scour counter measures on US-41 over the Sturgeon River Slough, Houghton County. This project includes a 2 year bridge coating warranty. Control Sec Job No Federal No GF19 31051 130232A N/A Net classification required for this project is 208 N4 or 208 N9-1G In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MDOT - 1904 032- Bridge Rehabilitation Including Healer/sealer, Deck Patching, Full Steel Cleaning and Coating and Scour Counter Measures on Us-41
Award
Bridges / Tunnels
$372,619.00
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2019
May 15, 2019
US-41, Houghton, MI
Related To This Project
Houghton, MI
--
Houghton, MI
Bid Date: Jan 29 2026
Houghton, MI
Bid Date: Jan 14 2021
Houghton, MI
Bid Date: Apr 13 2021
Houghton, MI
Bid Date: Nov 21 2025
Houghton, MI
--
Houghton, MI
Bid Date: Dec 11 2025
Houghton, MI
Bid Date: Oct 17 2025
Houghton, MI
Bid Date: Oct 15 2025
Houghton, MI
--
Houghton, MI
Bid Date: Dec 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
