Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2019 at 8:00 PM

Updated May 15, 2026

Renovation of a mixed-use development in York, Maine. Completed plans call for the renovation of a educational facility.

As of April 17,2019 project is expected to begin between the end of June and Aug 20, 2019 Replace windows and additional exterior work, York High School & Village Elementary School York, Maine The scope of work includes, but is not limited to, replacing approximately 80 windows, gym siding and exterior painting. Proposals must be accompanied by a 5% Bid Bond. The successful bidder will be required to provide 100% Performance Bond and 100% Payment Bond. The Owner reserves the right to accept or reject any or all bids as may best serve the interest of the Owner.

Award

Educational

$249,000.00

Public - City

Renovation

8

14

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
251
Bidding Soon
3,618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed