BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2019 at 8:00 PM

Updated November 15, 2023

Site work, paving and new construction of a bridge / tunnel in Kodiak, Alaska. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The scope of the work includes removal of an existing steel culvert at an unnamed inlet creek to Lake Orbin and installation of a new culvert to aid fish passage, including excavation, back fill, dewatering, installation of electrical & communication conduits, revegetation, and restoration of the site as described in the design documents. An alternate bid is included for removal of nearby debris dam, installation of roughened channel stone and site restoration. All in-stream work must be complete not later than August 31, 2019. All remaining work must be complete not later than September 30, 2019.

Bid Results

Bridges / Tunnels

$57,999.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
9
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2019

May 9, 2019

Project location map

To Be Determined, Kodiak, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.