Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 11, 2019 at 8:00 PM
Updated November 15, 2023
Site work, paving and new construction of a bridge / tunnel in Kodiak, Alaska. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The scope of the work includes removal of an existing steel culvert at an unnamed inlet creek to Lake Orbin and installation of a new culvert to aid fish passage, including excavation, back fill, dewatering, installation of electrical & communication conduits, revegetation, and restoration of the site as described in the design documents. An alternate bid is included for removal of nearby debris dam, installation of roughened channel stone and site restoration. All in-stream work must be complete not later than August 31, 2019. All remaining work must be complete not later than September 30, 2019.
Bid Results
Bridges / Tunnels
$57,999.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
