BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2019 at 8:00 PM

Updated July 22, 2026

Site work and paving for a mixed-use development in Allouez, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 28, 2019 project has been awarded to Carl Bowers & Sons Construction Co amount of $1,833,319.50 . The started last may 20th and anticipated end date will be on Middle to end of September. Construction of Watermain, Sanitary Sewer & Storm Sewer Replacement, Sidewalk Installation, Curb & Gutter Replacement, Bituminous Surfacing of the Streets and Turf Restoration.AL-2019-2 1,300 Lineal Feet of sizes 8" Sanitary Sewer 850 Lineal Feet of 6" Sanitary Sewer Laterals 1,600 Lineal Feet of 6" & 8" Water Main 800 Lineal Feet of 1" & 2" Poly Water Service 2,100 Lineal Feet of 12"- 27" Storm Sewer 5,700 Lineal Feet of 24" Curb & Gutter 12,000 Square Feet of 6" Concrete Aprons & Sidewalk 22,500 Square Feet of 4" New Concrete Sidewalk 6,500 Cubic Yards Excavation 2,400 Tons of Bituminous Binder & Surface Course 5,400 Square Yards Turf Restoration All bidders shall bid in accordance with and upon the Bid Forms included in the contract documents. No bid shall be received unless accompanied by a certified check or satisfactory bid bond payable to the Village of Allouez in the amount not less than 5% of the maximum bid as guarantee that, if the bid is accepted, the bidder will execute and file the contract, performance/payment bonds and insurance certification, as required by the contract documents, within ten (10) days after the Notice of Award. The owner reserves the right to reject any and all bids, waive any information in bidding or to accept the bid or bids which best serves the interests of the Village of Allouez. No bid shall be withdrawn for a period of 60-days after the scheduled opening without the consent of the Owner. Proof of Responsibilty-A proof of responsibility (pre-qualification) form for all contracts must be filed in the Village of Allouez, Director of Public Works, 1900 Libal street, Green Bay Wisconsin 54301 no later than 5-calendar days prior to the date of receiving bids, and shall show sufficient ability, equipment and experience to properly perform the contract. The Village of Allouez decision as to qualifications shall be final.

Award

$1,833,320.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
28
Bidding Soon
817
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Allouez, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.