BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in West Union, Iowa. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

The City of West Union reserves the right to reject any and all bids.Project in general consists of construction of new wastewater department shop and storage building consisting of concrete footings, foundation and floor; walls; insulation; steal panels, finished roof, interior and exterior walls and ceiling; building electrical, plumbing and HVAC; and other miscellaneous site improvements. Alternative A will be a wood frame building. Alternative B will be a steel frame building. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, as included in the Bid Form. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the regular business hours, and may obtain copies of the Bidding Documents from the Issuing Office as described below.Upon accessing the website, Bidders will see a link titled, "Obtain Bidding Documents". Clicking this link will take Bidders directly to the Quest Network Service, and will display all projects available for bid through Fehr Graham. On this page, projects ads will be listed in the left-hand column with project numbers assigned by Quest displayed. Potential Bidders can enter the Quest project number 6215522 in the field provided to view the full ad for the City of West Union Wastewater Department Shop and Storage Building, and download a complete set of bidding documents from this page.Work on the improvement shall be commenced upon issuance of Notice to Proceed, which will occur after approval of the contract by the Council. Contractor shall achieve Substantial Completion by September 30, 2019, and date of Final completion of the Construction by October 31, 2019. Liquidated Damages in the amount of $500.00 per Working Day will be assessed for each Working Day that any work shall remain uncompleted beyond the stated substantial and final completion dates. Bid security shall be furnished in accordance with the Instructions to Bidders. The bidder's security shall be submitted in the form of a Bid Bond in the amount of 5% of the total lump sum bid amount, as obtained from the surety companies listed on the US Department of Treasury's Circular 570. No other type of bid security will be accepted. The Bid Bond shall contain no condition except as provided in the specifications. The successful bidder will be required to furnish a construction performance, payment, and maintenance bond in an amount equal to one hundred percent (100%) of the contract price. Said bonds shall be issued by the circular 570 listed surety company and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and the maintenance of said improvements in good repair from the time of acceptance of the improvements by the City for not less than two (2) years. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Alternative A Wood Frame Building:- Heying Mfg. Co. Inc:- $793,009 Alternative B Steel Frame Building Heying Mfg. Co. Inc:- $883,005

Award

Municipal

$1,676,014.00

Public - City

New Construction, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
29
Bidding Soon
827
All Active Projects
212
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 10, 2019

May 15, 2019

October 31, 2019

img_map_placeholder

Echo Valley Rd, West Union, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.