Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 3, 2019 at 8:00 PM
Updated August 26, 2025
Site work for a water / sewer project in Saint Clair Shores, Michigan. Completed plans call for site work for a water / sewer project.
Piggyback contract No Questions are submitted online No Water_Main_Replacement_Program_2019 via pipe bursting. General Requirements - Bid Deposit Required - Insurance Required The work under contract comprises four separate divisions of work which may be awarded as a single contract or up to four (4) individual contracts as follows: Division 1: Shock Street from 11 mile to Martin This division of the project consists of the replacement of approximately 2,435 lineal feet of eight inch (8") water main. New water main consists of new PVC pipe installed using pipe bursting methods, new hydrants, and gate valves. Other work items include pavement and sidewalk removal and replacement, driveway removal and replacement and minor drainage improvements. Division 2: Evergreen Street, from Harper to Greater Mack This division of the project consists of the replacement of approximately 2,549 lineal feet of eight inch (8") water main. New water main consists of new PVC pipe installed using pipe bursting methods, new hydrants, and gate valves. Other work items include pavement and sidewalk removal and replacement, new ADA ramps, landings and detectable tiles, driveway removal and replacement and minor drainage improvements. Division 3: Harmon Street, from Stephens to 10 Mile This division of the project consists of the replacement of approximately 2,613 lineal feet of eight (8") inch water main. New water main consists of new PVC pipe using pipe bursting methods, new hydrants and gate valves. Other work items include pavement and sidewalk removal and replacement, new ADA ramps, landings and detectable tiles, driveway removal and replacement and minor drainage improvements.
Bid Results
Water / Sewer
$1,448,845.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2019
June 24, 2019
Multiple Locations, Saint Clair Shores, MI
Related To This Project
Saint Clair Shores, MI
Bid Date: Nov 07 2025
Saint Clair Shores, MI
Bid Date: Jan 06 2026
Saint Clair Shores, MI
Bid Date: Jan 13 2026
Saint Clair Shores, MI
Bid Date: Feb 03 2026
Saint Clair Shores, MI
Bid Date: Feb 26 2026
Saint Clair Shores, MI
Bid Date: Feb 19 2026
Saint Clair Shores, MI
Bid Date: Mar 18 2026
Saint Clair Shores, MI
Bid Date: Mar 31 2026
Saint Clair Shores, MI
Bid Date: Mar 19 2019
Saint Clair Shores, MI
Bid Date: Jul 09 2019
Saint Clair Shores, MI
Bid Date: Aug 11 2020
Saint Clair Shores, MI
--
Saint Clair Shores, MI
Bid Date: Oct 18 2022
Kentwood, MI
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed