BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a military facility in Valdosta, Georgia. Completed plans call for the construction of a 57,873-square-foot military facility; military facility; for site work for a military facility; and 1,200-square-foot military facility.

This project is being rebid due to price escalations catalyzed from required phasing, previously unforeseen. The pumphouse, water storage tank steel tank (33 16 15), water utility distribution piping (33 11 00) / sanitary sewerage (33 30 00) / storm drainage utilities (33 40 00) / underground electrical distribution (33 71 02) / telecommunications outside plant (33 82 00) to 5' of Building 675 - HMU Building, are shown for reference only as they are currently under construction and are included in a previous phase contract. Do not include pricing for these items in this bid. Construction of a new 57,873 SF, 4 bay maintenance hangar building with support offices and rooms, A 1200 SF Fire Pump building and adjacent 150,000-gallon fire water storage tank. Building construction is masonry and steel with exterior metal siding and roofing. Complete MEP and finishes are included along with site utilities and paving and the demolition of existing buildings and tanks. *Davis Bacon Wage Rates are applicable in addition to goal for minority and female worker participation on the aggregate workforce. Reference the front end of the specifications. *Small business Participation including Small Disadvantaged, Women Owned, HUB Zone, Veteran Owned and Service-Disabled Veteran Owned are part of the project. *Minimum LEED Silver Certification will apply on this project. *Buy American Act per FAR 52.246-11 will apply *All pricing and bid proposals must be valid for 180 Days from bid date. Also, various Options (alternates) have an extended pricing timeline that is to be allowed for as noted on bid form. Review and provide costs on all Alternates as applicable. *This project timeline has been extended due to the public health crisis.

Post-Bid

Military

$23,606,712.00

Public - Federal

LEED Certification, New Construction, Site Work

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
56
Bidding Soon
579
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

August 14, 2023

Project location map

Bemiss Rd, Valdosta, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.