Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 30, 2019 at 8:00 PM
Updated May 10, 2025
Renovation of a municipal facility in New London, Wisconsin. Completed plans call for the renovation of a municipal facility.
The project shall consist of the following: 1. Removal of existing 1' x 4', surface mounted, 3 bulb, T-8 florescent light fixtures and replace with 50 watt 2' x 4' LED surface mounted fixtures. 2.LED fixtures shall be Nuvo Lighting Model #65-324 with the following specifications; 100-277 volts, 50 watt, 4906 lumens, PMMA Translucent white. 3. Mounting frame kit shall be Nuvo Lighting, Model #65-363, white finish, 24" x 48". 4. Removal of existing single pole and 3-way switches with single pole and 3-way dimmer controls. 5. Single pole dimmer controls & 3-way dimmer controls shall be Nuvo Lighting compatible for #65-324 in white. 6. Contractor will be responsible for all materials (even if not specifically called out) and labor for the project. 7.Contractor responsible for off-site disposal of all removed items, including, but not limited to; fixtures, switches, bulbs and ballasts. 8. Minimum one-year labor warranty. 9. Minimum five-year parts/equipment warranty. Even though we specify a manufacturer and style number, that is not meant to limit acceptable lighting options; rather it is a means to establish a minimum level of acceptable quality. You may bid any manufacturer and model as long as the lighting you bid is equal to or exceeds the specifications of the lighting requested. Outagamie County will be the sole judge of equivalency in the flooring. If lighting bid is different than the specified lighting, the bidder must include detailed specification and information on the option bid, as well as a comparison of the lighting bid vs the specified lighting. Failure to provide the detailed information and comparison will result in the rejection of your bid. The main base bid will be to replace the lighting in the Great Room and Library. This project will consist of; 10.Replacement of 49 fixtures, including frames 11.Replacement of 4 single pole dimmer controls 12.Replacement of 5 3-way dimmer controls We are requesting an alternate bit to replace the lighting in the Great Room only. This project will consist of; 13. Replacement of 33 fixtures, including frames 14.Replacement of 4 single pole dimmer controls 15. Replacement of 2 3-way dimmer controls A purchase order will be issued by end of day May 3rd. Work could only be done from June 3 - 14. Work must be completed by noon June 14, 2019. Work hours are Monday through Friday 8:00 am - 4:30 pm. Once work starts the contractor must work a full shift each work day until the project is completed. Failure for the contractor to achieve completion by June 14, 2019 will result in a $250 per calendar day liquidated damages penalty payable to the County
Award
Municipal
$7,970.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2019
June 5, 2019
N3880 Rogers Rd, New London, WI
Related To This Project
New London, WI
Bid Date: Apr 29 2025
New London, WI
Bid Date: Jun 05 2025
New London, WI
Bid Date: Jun 17 2025
New London, WI
Bid Date: Jul 17 2025
New London, WI
Bid Date: Jul 17 2025
New London, WI
Bid Date: Sep 16 2025
New London, WI
--
New London, WI
Bid Date: Apr 10 2025
New London, WI
Bid Date: Apr 16 2025
New London, WI
Bid Date: May 23 2025
New London, WI
Bid Date: Oct 07 2025
New London, WI
Bid Date: Jan 23 2025
New London, WI
Bid Date: Apr 24 2025
New London, WI
--
New London, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
