BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a museum in South Haven, Michigan. Completed plans call for the construction of a 15,000-square-foot, two-story above grade museum; and 3,000-square-foot museum.

As of December 21, 2021, construction is underway and is anticipated to be complete summer 2022. The objective of the proposed improvements at the Michigan Maritime Museum is to expand the regional and community Michigan Maritime Museum impact and enhance the waterfront experience for both locals and visitors. Goals and objectives include a total transformation of the maritime educational and research capability, acquisition and waterfront preservation of the historic Jensen property on the Black River, year round museum campus events and generating greater economic benefits to the City of South Haven. To accomplish this, the site will include new docks, an event tent and event lawn, and various structures on site will be either replaced or improved to meet the needs and desires of boating, history and maritime enthusiasts. The proposed improvements consist of the following: 1) Demolition of the existing museum building 2) Construction of a new, 15,000 sf, two-story museum building with exhibit, educational and retail facilities on the first floor and an exhibit/event venue, offices, a board room and catering kitchen on the second floor. 3) The existing two-story building at the point will be removed and replaced with a 3,000 sf exhibit building with restrooms, a concession kitchen and small craft exhibit capabilities on the first floor with a lookout area on the second floor. 4) The docks and utilities will be updated to meet the current needs of the Michigan Maritime Museum collection of the vessels for On the Water experiences and local boaters. 5) The Jenson Buildings will be elevated 1 foot and preserved on the museum campus to accommodate the proposed site improvements. 6) Site improvements will accommodate visiting museum guests, school and wedding groups, Museum and South Haven Community events using Event Lawns, Courtyards, Boardwalks, Renovated Dock and Pier System, River and Harbor designated lawns, a Lawn Theater and event tent, signage and site lighting.

Under Construction

Museum

$3,600,000.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
68
Bidding Soon
1,017
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2021

img_map_placeholder

260 Dyckman Ave, South Haven, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.