Published March 28, 2023 at 8:00 PM
Updated January 29, 2024
Demolition, site work, paving and new construction of a civil project in Iowa City, Iowa. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and for site work for a water / sewer project.
All bids rejected by city This project generally includes the removal and replacement of the existing four-lane concrete bridge with a new continuous concrete slab bridge over Ralston Creek, designed to meet local and state guidelines for traffic and pedestrians, six-foot sidewalks on both sides, and aesthetic improvements to enhance the neighborhood and views of the creek. Streambank stabilization will occur upstream and downstream of the new bridge with the addition of fabric formed concrete revetment and Class E revetment. Storm sewer will also be upsized from 15” to 30” diameter RCP pipe to provide additional capacity from Court Street to Ralston Creek where localized flooding during heavy rainstorms has been reported. Water main improvements will occur immediately north of the bridge to prepare for a future project. In addition, the project will include the undergrounding of overhead utilities within the project corridor. Engineer's Estimate $2,900,000 -------------------------------------------------------------------------------------------------------------------------------- UPDATE : https://user-9hywe2.cld.bz/Master-Proposed-Book-FY2023-copy1/538/ This project will replace the existing Gilbert Street bridge over Ralston Creek. In addition, the project will include removal and replacement of slope protection, sidewalk, storm sewer and street pavement, and other related work. Project is included City of Iowa City FY 2022-2026 CIP. Page 596 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.press-citizen.com/story/news/2022/02/15/iowa-city-public-hearing-217-million-budget-set-tuesday/9184728002/ Iowa City is also planning to replace the Gilbert Street bridge over Ralston Creek in downtown Iowa City for $3.1 million in 2023. The project will remove and replace slope protection at the bridge and includes work on sidewalks, storm sewer and street pavement. ___________________________________________________ This project will replace the existing Gilbert Street bridge over Ralston Creek. In addition, the project will include removal and replacement of slope protection, sidewalk, storm sewer and street pavement, and other related work. The project is included in the city's 2021-2025 Capital Improvement Program (CIP). As of December 27 2021, this project is in the design stage and construction is anticipated to begin in the Spring of 2023 as per source. Project is expected to bid out in 4Q of 2022 or 1Q of 2023*
Final Planning
Bridges / Tunnels
$2,900,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.