Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2020 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a mixed-use development in Fort Irwin, California. Completed plans call for the construction of a 8,000-square-foot library; for site work for a library; for the demolition of a 7,582-square-foot military facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of July 16, 2020, this project has been awarded. All trades have been let. MBE: 19.7% WBE: 6.9% Construction of a new 8,000 S.F. library to replace the existing library structure that is in one of Ft. Irwin's temporary structures. The facility shall include a reception center/customer service desk, reading and stack areas, multi-purpose room, computer stations, children area, men and women restrooms, mechanical, janitorial closet, storage areas, office, space for managers, and break room with a unisex toilet for employees. Supporting facilities shall include water, sanitary sewer, electrical service, information service, and telephone and internet access. Site development will include grading, storm water control, parking area with concrete curbs and gutters, concrete sidewalks, and landscaping. Demolition of the existing 7,582 S.F. temporary facility. Air conditioning for the new facility (30 tons) The estimated magnitude of construction is $5,000,000.00 - $10,000,000.00 Period of performance is 365 calendar days. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000.00. If the bidder is a large business, the firm will be required to submit a sub-contracting plan at the request of the Contracting Officer subsequent to bid opening Bidders are advised that this project may be delayed, cancelled or revised at any time during solicitation, evaluation, and/or final award process. Due to issues with access to Fort Irwin - NTC, in direct relation to the COVID-19 outbreak, the Site Visit scheduled for March 24th, 2020 is now canceled. *This project timeline has been extended due to the public health crisis.

Bid Results

Library

$5,480,805.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

128 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
16
Bidding Soon
269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2020

June 30, 2020

Project location map

5th St. and Ave. F, Fort Irwin, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed