BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2019 at 7:00 PM

Updated November 13, 2025

Site work and paving for a transportation facility in Valdosta, Georgia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

For the project known as: Valdosta Regional Airport Schedule A: Taxiway M Improvements And Schedule B: North Ramp Taxilane System Improvements The OWNER of the project is the Valdosta-Lowndes County Airport Authority. The Engineer/Architect for the project is Holt Consulting Company, LLC. The approximate extent and character of the work is generally described as follows: Schedule A: Taxiway M Improvements: Bid shall consist of re-construction and widening to Taxiway M between Runway 17-35 and previously reconstruction portion of Taxiway M included in the Commerical Terminal Apron project (approximately 3,035 square yards). This scope will include but is not limited to removal of the asphalt pavement section, re-construction and widening of the asphalt taxiway section to current FAA standards, update marking and electrical elements as necessary, installation of minor drainage structures, grassing, and erosion control. The approximate extent and character of the work is generally described as follows: Schedule A: Taxiway M Improvements: Bid shall consist of re-construction and widening to Taxiway M between Runway 17-35 and previously reconstruction portion of Taxiway M included in the Commerical Terminal Apron project (approximately 3,035 square yards). This scope will include but is not limited to removal of the asphalt pavement section, re-construction and widening of the asphalt taxiway section to current FAA standards, update marking and electrical elements as necessary, installation of minor drainage structures, grassing, and erosion control. Bid security in the form of a bid bond equal to 5% of the total bid is required. Bidders must submit bids for all Bid Items. Contract security in the form of 100% Performance and Payment Bonds will be required. No bid may be withdrawn after closing time for the receipt of proposals for a period of One Hundred Twenty (120) calendar days. Bidders shall inform themselves concerning Georgia Laws and comply with same. Downloaded documents may then be printed at any reprographics company convenient to the bidders. Questions of a technical nature should be directed to the Jacob Redwine at (770) 285-8754 or transmitted electronically via email to "mailto:jredwine@holtconsultingco.com" The time allowed for Substantial Completion on the Schedule A: Taxiway M Improvments and Schedule B: North Ramp Taxilane Systems Improvements are as follows: Construction contract time for Schedule A: Taxiway M Improvements, if awarded, will be completed within Thirty-One (31) consecutive calendar days from the Notice to Proceed. Construction contract time for Schedule B: North Ramp Taxilane System Improvements, if awarded, will be completed within Eighteen(18) consecutive calendar days from the Notice to Proceed. The total construction contract time for all schedules, if awarded, will be completed within Forty-Nine (49) consecutive calendar days from the Notice to Proceed. This project is funded under provision of the Airport and Airway Safety and Capacity Act of 1987. Certain mandatory Federal requirements apply to this solicitation and will be made a part of any contract awarded. (a) Davis Bacon Act (DOL Regulation 29 CFR Part 5) (b) Affirmative Action to Ensure Equal Employment Opportunity (Executive order 11246 and DOL Regulation 41 CFR Part 60) (c) Copeland Act, 29 CFR Part 3. (d) Contract Work Hours and Safety Standards Act. (e) Title VI of Civil Rights Act of 1964. (f) Disadvantaged Business Enterprises participation 49 CFR Part 26. The DBE participation goal is 8.6%. (g) Government wide Debarment and Suspension and Government wide Requirements for Drug-free Workplace (DOT Regulation 49 CFR Part 29) (h) Buy American Preferences (Title 49 United States Code, Chapter 501) (i) Foreign Trade Restriction: Denial of Public Works Contracts to Suppliers for Goods and Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (DOT Regulation 49 CFR Part 30) (j) Goals for Minority and Female Participation (41 CFR Part 60-4.2) (k) Certification of Nonsegregated Facilities (41 CFR Part 60-1.8) (l) Debarment, Suspension, Ineligibility and Voluntary Exclusion (49 CFR Part 29) (m) Bid guarantee of 5% (49 CFR Part 18.36(h)(1)) (n) Performance Bond of 100% (49 CFR Part 18.36(h)(2)) (o) Payment Bond of 100% (49 CFR Part 18.36(h)(3)) By submitting a bid/proposal under this solicitation, except for those items listed by the offeror on a separate and clearly identified attachment to this bid/proposal, the offeror certifies that steel and each manufactured product, is produced in the United States (as defined in the clause Buy American - Steel and Manufactured Products For Construction Contracts) and that components of unknown origin are considered to have been produced or manufactured outside the United States. Offerors may obtain from Holt Consulting Company, LLC, lists of articles, materials, and supplies excepted from this provision. The Valdosta - Lowndes County Airport Authority reserves the right to waive any informalities or irregularities in the bids received and to reject any or all bids or to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests.

Award

Transportation Terminals

$944,484.00

Public - County

Paving, Site Work

65

26

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
51
Bidding Soon
577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2019

January 13, 2020

Project location map

1750 Airport Rd, Valdosta, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.