Site work and paving for a civil project in Sherwood, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Awarded Amount: $17,610,719.45 The Project: The Project Name Is: Elwert Road - Kruger Road Intersection Improvements Schedule A Elwert Road: Or99 Intersection To South Of Handley Road Kruger Road: Elwert Road To City Limit Or99 Intersection Sunset Blvd: Or 99 To Woodhaven Dr Scheudle B Haide Road: Elwert Road To City Limit Elwert Road: South Of Handley Road To South Of Edy Road Edy Intersection Edy Road: Sw Copper Terrace Drive To Sw Settlement Drive The work to be done under this contract consists of the following in Washington County: 1. Construct joint utility trench 2. Construct multi-lane roundabout and median islands 3. Construct full depth replacement and relocation of existing roadways 4. Construct stormwater pond, water quality structures, and water quality manholes 5. Install stormwater culverts, pipes, manholes, and inlets 6. Construct shared-use paths and curb ramps 7. Construct curbs and guardrails 8. Construct retaining walls 9. Install sanitary mainline pipe 10. Construct water pipe and appurtenances 11. Install signing, illumination, signals and pavement markings 12. Construct asphalt, concrete and gravel driveways 13. Construct new northbound dual left turn lanes on Pacific Hwy to Elwert Rd 14. Construct extended southbound dual left turn lanes on Pacific Hwy to Sunset Blvd 15. Construct revised southbound bike lane and right turn lane on Pacific Hwy to Elwert Rd 16. Install asphalt overlay within intersection of Pacific Hwy, Elwert Rd, and Sunset Blvd 17. Install landscaping and irrigation within roadway improvements on Haide Rd, Elwert Rd and Kruger Rd 18. Install signals, landings, crosswalk striping, pedestrian push buttons and retaining walls at Edy Rd and Elwert Rd 19. Install pervious asphalt sidewalk infill on Edy Rd 20. Install new southbound left turn from Elwert Rd to Handley Rd and right and left turn lane pockets on Handley Rd to Elwert Rd 21. Perform additional and Incidental Work as called for by the Specifications and Plans The Project cost range is $15,000,000 - $25,000,000 PRE-BID MEETING The County will not hold a pre-bid meeting for this project. Bids publicly read aloud in Training Room 1. All interested parties are invited to attend. Bids received after the above stated time will not be accepted. Bids must contain: o A residency statement as defined in ORS 279C.365. o A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. Solicitation documents purchased from Washington County or printed from ORPIN may be used. No electronic bid submittals will be accepted. BIDDERS: Bidders are solely responsible for ensuring actual receipt of the bid by Washington County DLUT. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board pursuant to ORS 701.026 prior to submitting a bid. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the county in these bid documents. Otherwise, the bid may be rejected as non-responsive. Bidders must conform to the requirements of these bid documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the ORPIN web site prior to bidding. Bidders must sign all Bid Forms, and in doing so agree to comply with the statement in the Bid Form regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit, in a sealed envelope, the First-tier Subcontractors Disclosure Form provided at the end of Part 2.0 of this Book. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). Licensing per ORS 468A.720 (working with asbestos) is not required for this project. THE COUNTY: The County reserves the right to waive any irregularities or informalities. Plan Holder's List and Bid Results: Information regarding plan holder lists and bid results will only be available on the ORPIN web site. Questions: Submit questions only in writing to following email address: CPMProjects@co.washington.or.us Project staff will only respond to questions submitted in writing Project Contacts: Patrick Oakes, Project Manager 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7826 Fax: 503-846-7810 Kira Furby, Engineering Associate 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7816, Fax: 503-846-7810 To obtain a paper copy of the Bid Documents: o Visit Washington County Land Use & Transportation, 1400 SW Walnut St, Hillsboro, OR 97123 OR o Call Washington County Land Use & Transportation, Capital Project Services Division, 503-846-7800

Award

Roads / Highways

$17,610,719.00

Public - County

Paving, Site Work

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
64
Bidding Soon
1,129
All Active Projects
428
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2019

August 19, 2019

img_map_placeholder

SW Kruger Rd & SW Elwert Rd, Sherwood, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.