BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fountain Valley, California. Completed plans call for site work for a water / sewer project.

Estimated Start Date will be on October and End Date will be on March The work necessary for the completion of this contract consists of: 1. Mobilization of equipment and personnel to the well site. 2. Disconnecting the piping & electrical systems from the well and removing the motor, pump column and pump bowls from the well. Inspect the condition of the pump system and submit a report to the City for its refurbishment/repair or for replacement. City staff will handle all electrical disconnections from the permanent motor. Permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. 3. Initially conduct wire-brushing and bailing of sediment fill from the bottom of the well. Use a hydrogen peroxide solution to help remove encrusting material from the casing walls. 4. Conduct an initial video survey of the entire well casing. 5. Perform Casing Inspection Thickness Measurement (CITM) survey following the video survey, to determine the current thickness of the well casing. 6. Optional: Install casing patches to damaged louvers (if identified during CITM survey), as specified. 7. Optional: Perform a gyroscopic plumbness and alignment survey and caliper survey on the well. 8. Optional: Install a Type 304L Stainless Steel casing liner and gravel pack, as specified. 9. Perform "Air-Jetting"of the well to help dislodge and loosen any material from the perforations and the gravel pack around the well. 10. Conduct chemical treatment of the well using HerChemTec solutions. 11. Perform mechanical re-development via simultaneously swabbing and airlifting of the chemical solutions from the well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system. 12. Mobilize, install, operate, maintain and then remove a temporary test pump and test motor capable of pumping up to 3,500 gpm. 13. Conduct pumping development by pumping and surging. 14. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test. 15. Near the end of the constant rate pumping test, perform a dynamic spinner survey in the well. 16. Remove the test pump and disinfect the well. 17. Re-install the new pump components in the well and conduct vibration testing, and trim balance, followed by a 72-hour pumping test at the design rate. Disinfect the pump components during installation. 18. Perform well chlorination and clean up the well site. Liquidated Damages : $2,000/Day Response Types : Line Item, General Attachments, Subcontractors, Bid Bond Type of Award : Lump Sum License Requirements : Contractor's License "C-57" Required

Award

Water / Sewer

$473,660.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
579
Active Projects
257
Bidding Soon
4,021
All Active Projects
1,806
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 12, 2019

October 1, 2019

March 1, 2020

img_map_placeholder

17145 Magnolia St, Fountain Valley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.